Marathon Computer V-4224 Stand Clear While Baler is in Operation, PRE-OPERATING Instructions

Page 5

1 OPERATION

PRE-OPERATING INSTRUCTIONS

STAND CLEAR WHILE

BALER IS IN OPERATION.

WARNING: DO NOT OPERATE BALER UNTIL OPERATING INSTRUCTIONS ARE THOROUGHLY UNDERSTOOD.

NEVER ENTER ANY PART OF THE BALER UNLESS THE DISCONNECT SWITCH HAS BEEN TURNED OFF AND PADLOCKED. Before starting the baler, be sure no one is inside. Be certain that everyone is clear of all points of operation and pinch point areas before starting. See Lock-Out & Tag-Out instructions in the Maintenance section.

THE EMPLOYER SHOULD ALLOW ONLY AUTHORIZED AND TRAINED PERSONNEL TO OPERATE THIS BALER. This baler is equipped with a key operated locking system. The key(s) should be in the possession of only authorized personnel. Turn off and remove key after use.

Federal regulation prohibits operation by persons under 18 years of age.

BE CERTAIN TURNBUCKLE AND LATCH IS FULLY LOCKED IN PLACE ON BALE CHAMBER DOOR BEFORE STARTING BALER.

Pay close attention to the RED WARNING LIGHT on the control panel. If the light is illuminated when the feed gate is raised, there is a malfunction of the magnetic interlock system. IN THIS EVENT, DISCONTINUE USE OF THE BALER AND LOCK-OUT & TAG-OUT THE BALER PER THE INSTRUCTIONS IN THE MAINTENANCE SECTION, PAGE 2-1. Perform necessary repairs before continuing operation of the baler.

O N LY AUTHORIZED PERSONNEL SHOULD BE ALLOWED INSIDE THE

PANEL BOX. The panel box contains high voltage components. See Lock-Out

&Tag-Out instructions in the Maintenance section.

DANGER

460400

VOLTS

06-0045

1-3

Image 5
Contents VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PA Play IT SafeContents Operation EC Declaration of Conformity PRE-OPERATING Instructions Stand Clear While Baler is in OperationControls Control Description ON-OFF Keyed Selector SwitchTo Make a Bale Operating Instructions Making a BaleFor Bale TIE OFF & Bale Eject Operating Instructions Bale TIE OFF/BALE EjectFront View of Baler Diagram Bale TIE OFF/BALE EjectSide View BaleSlot Cleaning Tool Front View TIE Slot CleaningDecals Decal Placement 460400 Supporting of Platen Annual Filter Maintenance Periodic MaintenanceMonthly Three MonthsHydraulic System Pressure Setting Pressure SettingMagnetic Interlock Testing Pressure Setting and Interlock TestingCylinder Rebuilding Cylinder Removal and RebuildingCylinder Removal Feed Gate Latch Adjustment Principles of Operation Operating CharacteristicsVoltage Charts Electrical RequirementsPanel BOX Power Unit Electrical Schematic 0489 Hydraulic SchematicRecommended Oils Parts ListGeneral Installation InstallationAnchoring to Concrete PAD Grounding Instructions Electrical InstallationSTART-UP Instructions Motor Rotation Applies to Three Phase Units only