2 MAINTENANCE

LOCK-OUT & TAG-OUT INSTRUCTIONS

OFF

(Typical disconnect shown, other types may lock-out differently.)

FOREWORD: Before entering any part of the baler, be sure that all sources of energy have been shut off, all potential hazards have been eliminated, and the baler is locked-out and tagged-out in accordance with OSHA and ANSI requirements. Before servicing the hydraulic system or the inside of the bale chamber,

THE PLATEN MUST BE PROPERLY SUPPORTED AS SHOWN ON THE NEXT PAGE. The specific lock-out and tag-out instructions may vary from company to company (i.e. multiple locks may be required, or other machinery may need to be locked-out and tagged-out). The following instructions are provided as minimum guidelines.

INSTRUCTIONS

1.Move the main disconnect lever to the OFF position.

2.Padlock the disconnect lever with a keyed padlock and take the key with you.

3.Along with the padlock, place an appropriate, highly visible, warning tag on the disconnect lever. The tag should provide a warning such

as: “ Danger: Do not operate equipment. Person working on equipment. Warning: Do not energize without the permission of _________________________.”

4.After locking and tagging the baler, try to start and operate the baler (as outlined in the Operating Instructions) to make sure the lock-out and tag-out is effective. If the lock-out and tag-out is effective, remove the key from the keyswitch and take with you.

ELECTRICAL: The panel box contains high voltage components. Only authorized service personnel should be allowed inside the box. Authorized service personnel should be allowed inside the box only after the baler has been locked-out and tagged-out.

DANGER

460400

VOLTS

06-0045

HYDRAULIC: Stored hydraulic energy must be removed from the baler hydraulic circuit for complete lock-out and tag-out. Make sure that this energy has been relieved by manually depressing the solenoid valve pin located in the center of the coil end of each valve. See Diagrams on pages 2-4 and 2-11.

2-1

Image 14
Contents Play IT Safe VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PAContents Operation EC Declaration of Conformity Stand Clear While Baler is in Operation PRE-OPERATING InstructionsControls ON-OFF Keyed Selector Switch Control DescriptionOperating Instructions Making a Bale To Make a BaleOperating Instructions Bale TIE OFF/BALE Eject For Bale TIE OFF & Bale EjectSide View Diagram Bale TIE OFF/BALE EjectFront View of Baler BaleTIE Slot Cleaning Slot Cleaning Tool Front ViewDecals Decal Placement 460400 Supporting of Platen Monthly Periodic MaintenanceAnnual Filter Maintenance Three MonthsPressure Setting Hydraulic System Pressure SettingPressure Setting and Interlock Testing Magnetic Interlock TestingCylinder Rebuilding Cylinder Removal and RebuildingCylinder Removal Feed Gate Latch Adjustment Operating Characteristics Principles of OperationCharts Electrical Requirements VoltagePanel BOX Power Unit Electrical Schematic Hydraulic Schematic 0489Parts List Recommended OilsInstallation General InstallationAnchoring to Concrete PAD Electrical Installation Grounding InstructionsMotor Rotation Applies to Three Phase Units only START-UP Instructions