Marathon Computer V-4224 installation manual EC Declaration of Conformity

Page 4

1 OPERATION

P.O. Box 1798

Vernon, AL 35592-1798

800-633-8974

205-695-9105

http//www.marathonequipment.com

EC DECLARATION OF CONFORMITY

The Supply of Machinery (Safety) Regulations 1992

Pursuant to The Council of The European Communities Directive 89/392/EEC, as amended by

91/36P/EEC

The Machine/Installation:

PRODUCT: V-4224 Vertical Recycler Baler

SERIAL NUMBER: As specified for EC export

YEAR OF MANUFACTURE: 2006

The above has been developed, designed and manufactured in accordance with the above relevant statutory provisions by:

Marathon Equipment Company

950 County Road

Vernon AL, USA 35592

The following harmonized standards have been applied:

1991 EN 292/1 and EN 292/2, Safety of machines, devices and installations

1992 EN 418, Safety of Machinery, Emergency Stop Equipment, Functional Aspects. Principals for Design

1992 EN 294, Safety distance to prevent access to danger zones

1993 EN 60 204-1, Safety of Machinery, Electrical Equipment of Machines

1993 EN 349, Safety of Machinery, Minimum Gaps to Avoid Crushing Parts of the Human Body

1996 BS EN 982, Safety Requirements of fluid systems and components 1997 BS EN 1050, Safety of Machinery, Principles for Risk Assessment 1998 BS EN 953, Safety of machinery, Guards.

Technical documentation is available upon request.

The operating manual for the machine/installation is provided. (* ) in the language of the country of manufacture

(*) in the national language of the user

THIS DECLARATION WILL BECOME INVALID IF, FOLLOWING HAND OVER, THE

MACHINE/INSTALLATION IS ALTERED IN ANY WAY.

1-2

Image 4
Contents Play IT Safe VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PAContents Operation EC Declaration of Conformity Stand Clear While Baler is in Operation PRE-OPERATING InstructionsControls ON-OFF Keyed Selector Switch Control DescriptionOperating Instructions Making a Bale To Make a BaleOperating Instructions Bale TIE OFF/BALE Eject For Bale TIE OFF & Bale EjectDiagram Bale TIE OFF/BALE Eject Front View of BalerSide View BaleTIE Slot Cleaning Slot Cleaning Tool Front ViewDecals Decal Placement 460400 Supporting of Platen Periodic Maintenance Annual Filter MaintenanceMonthly Three MonthsPressure Setting Hydraulic System Pressure SettingPressure Setting and Interlock Testing Magnetic Interlock TestingCylinder Removal Cylinder Removal and RebuildingCylinder Rebuilding Feed Gate Latch Adjustment Operating Characteristics Principles of OperationCharts Electrical Requirements VoltagePanel BOX Power Unit Electrical Schematic Hydraulic Schematic 0489Parts List Recommended OilsInstallation General InstallationAnchoring to Concrete PAD Electrical Installation Grounding InstructionsMotor Rotation Applies to Three Phase Units only START-UP Instructions