Marathon Computer V-4224 installation manual Contents

Page 2

CONTENTS

SECTION 1 - Operation

Introduction

1-1

EC Declaration of Conformity

1-2

Pre-Operating Instructions

1-3

Controls

1-4

Control Description

1-5

Operating Instructions

 

Making A Bale

1-6

Bale Tie Off/Bale Eject

1-7

Diagram

1-8

Tie Slot Cleaning

1-9

Decals

1-10

Decal Placement

1-11

SECTION 2 - Maintenance

 

Lock-Out & Tag-Out Instructions

2-1

Supporting Of Platen

2-2

Periodic Maintenance

2-3

Pressure Setting

2-4

Interlock Testing

2-5

Cylinder Removal And Rebuilding

2-6

Feed Gate Latch Adjustment

2-7

Principles Of Operation

2-8

Charts

2-9

Panel Box

2-10

Power Unit

2-11

Electrical Schematic

2-12

Hydraulic Schematic

2-13

Parts List

2-14

Recommended Oil

2-14

Motor Warranty

2-14

SECTION 3 - Installation

 

General Installation

3-1

Anchoring To Concrete Pad

3-2

Electrical Installation

3-3

Start-Up Instructions

3-4

Copyright © 2002 Marathon Equipment Company

Image 2
Contents Play IT Safe VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PAContents Operation EC Declaration of Conformity Stand Clear While Baler is in Operation PRE-OPERATING InstructionsControls ON-OFF Keyed Selector Switch Control DescriptionOperating Instructions Making a Bale To Make a BaleOperating Instructions Bale TIE OFF/BALE Eject For Bale TIE OFF & Bale EjectSide View Diagram Bale TIE OFF/BALE EjectFront View of Baler BaleTIE Slot Cleaning Slot Cleaning Tool Front ViewDecals Decal Placement 460400 Supporting of Platen Monthly Periodic MaintenanceAnnual Filter Maintenance Three MonthsPressure Setting Hydraulic System Pressure SettingPressure Setting and Interlock Testing Magnetic Interlock TestingCylinder Rebuilding Cylinder Removal and RebuildingCylinder Removal Feed Gate Latch Adjustment Operating Characteristics Principles of OperationCharts Electrical Requirements VoltagePanel BOX Power Unit Electrical Schematic Hydraulic Schematic 0489Parts List Recommended OilsInstallation General InstallationAnchoring to Concrete PAD Electrical Installation Grounding InstructionsMotor Rotation Applies to Three Phase Units only START-UP Instructions