Marathon Computer V-4224 installation manual Anchoring to Concrete PAD

Page 29

3 INSTALLATION

ANCHORING TO CONCRETE PAD

The concrete pad should be level, and a minimum of 3000 PSI concrete, steel reinforced, 150mm thick. Anchor baler to floor using anchor brackets on sides of baler base. Two 18mm diameter anchor bolts required, Red Head type recommended.

1. Roll baler to the desired location.

2.Unbolt the Anchor Bracket from the baler. (both sides)

ANCHOR BRACKET IN

SHIPPING POSITION

3.Turn the Anchor Brackets over and re-bolt them to the baler.

4.Anchor the Anchor Bracket to the floor. (both sides)

TURN ANCHOR BRACKET

OVE AND ANCHOR TO

FLOOR

3-2

Image 29
Contents VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PA Play IT SafeContents Operation EC Declaration of Conformity PRE-OPERATING Instructions Stand Clear While Baler is in OperationControls Control Description ON-OFF Keyed Selector SwitchTo Make a Bale Operating Instructions Making a BaleFor Bale TIE OFF & Bale Eject Operating Instructions Bale TIE OFF/BALE EjectFront View of Baler Diagram Bale TIE OFF/BALE EjectSide View BaleSlot Cleaning Tool Front View TIE Slot CleaningDecals Decal Placement 460400 Supporting of Platen Annual Filter Maintenance Periodic MaintenanceMonthly Three MonthsHydraulic System Pressure Setting Pressure SettingMagnetic Interlock Testing Pressure Setting and Interlock TestingCylinder Rebuilding Cylinder Removal and RebuildingCylinder Removal Feed Gate Latch Adjustment Principles of Operation Operating CharacteristicsVoltage Charts Electrical RequirementsPanel BOX Power Unit Electrical Schematic 0489 Hydraulic SchematicRecommended Oils Parts ListGeneral Installation InstallationAnchoring to Concrete PAD Grounding Instructions Electrical InstallationSTART-UP Instructions Motor Rotation Applies to Three Phase Units only