Nortel Networks 600r manual Inspecting the interior of server, To remove the server cover

Page 24

24Chapter 3 Preparing for installation

Inspecting the interior of server

Introduction

To inspect the interior of your 600r server, you must remove the server cover.

Note: If the server is powered down, proceed with the next step. If the server if powered up, see the chapter, "Starting up and shutting down the CallPilot server", in Installation and Configuration Task List (NN44200-306) for proper shutdown procedures before you remove the server cover.

To remove the server cover

Step Action

1Attach the ESD strap to your wrist.

2While holding in the blue button at the top of the chassis, slide the top cover back until it stops.

3Lift the cover straight up to remove it from the platform.

4Ensure the CallPilot PCI riser card is secure.

5Inspect the interior for any cables that are not seated properly.

6Take note of any physical signs of damage. For example, check for loose piece parts and screws in the corners of the chassis.

7If you notice damage to any of the parts in your server, contact your Nortel representative immediately.

—End—

To replace the server cover

When you finish inspecting the interior of your server, replace the server cover.

Step Action

1Attach the ESD strap to your wrist and attach the other end to a known grounded connection.

2Place the cover on the server and align the cover with the chassis tab guides.

3Slide the top cover back until it stops.

—End—

Nortel CallPilot

600r Server Hardware Installation

NN44200-307 01.03 Standard

5.014 May 2008

Copyright © 2007-2008, Nortel Networks

Image 24
Contents 600r Server Hardware Installation Trademarks Information for Japan Japan Denan statementJapan Vcci statement Page Publication History MayMarch Publication History Contents Contents Chapter How to get help Getting help over the phone from a Nortel Solutions CenterGetting help from the Nortel Web site Getting help through a Nortel distributor or reseller Chapter 600r server description Conventions for WarningsThis chapter Server features Server dimensionsFront panel features SpecificationEnvironmental specifications Environmental conditionPower button NMI button not used Reset button ID button Front panelRear panel controls and features Label DescriptionRear panel Label Description PCI riser assembly PCI riser assemblyNetwork connectivity Sample network setup Meridian Sample network setup Communication ServerSample network setup with Meridian Sample network setup with Communication ServerSwitch connectivity LAN connectivityRemote access connectivity Supported peripheral devicesNetwork requirements Supported peripheral devices Device DescriptionReference documents Chapter Preparing for installation Installation overviewInstallation checklist IntroductionGlobal CallPilot Support for Anti-Virus What is next? Unpacking the 600r serverTo unpack the equipment Inspecting the interior of server To remove the server coverTo replace the server cover Inspecting the interior of server Preparing for installation Chapter Installing the server and peripheral devices Installing the serverConnecting peripherals to the server To install the serverRear panel connectors Rear panel Rear panel connectors Label Description To connect the mouse, keyboard, and monitor to the serverTo connect the modem to the server To connect the external Scsi tape driveScsi tape drive with terminator Connecting the server to the Elan subnet Connecting the server to the Nortel server subnet optional Media Access Control addressIf the server Then Installing the Nortel software feature dongle To connect the server to the Nortel server subnetTo install the software feature dongle Dongle plugged in to serverDongle without feature key Installing the software feature keyContinue with Connecting the server to power Installing the server and peripheral devices Chapter Connecting the server to power Safety precautionsLocating the power supply modules Safety informationConnecting the server to power About the power supply moduleRack power and grounding Before you beginConnecting the server to power To connect the 600r server to power Example setup of 600r with peripheralsWhat is next? Connecting the server to power Chapter EMC emission level protection for the 600r server Ferrite cores secured to an external cable Symbols/Numerics IndexIndex Index Index Page 600r Server Hardware Installation