Connecting the server to power 43
Note: When the 600r server is plugged into an AC outlet with power, the server automatically powers on. If there is a power outage and the 600r server loses power, the server automatically powers up after power is restored.
Step Action
1Plug the server AC power cord into the server rear panel.
2Plug the other end into an approved wall receptacle or power bar.
What is next?
Proceed to the Installation and Configuration Task List
Nortel CallPilot
600r Server Hardware Installation
5.014 May 2008
Copyright ©