![](/images/new-backgrounds/1223111/22311121x1.webp)
Installation
3.3.2Conduit Entrance Plate in bottom of the system
REAR
UTILITY 1
LEFT |
| RIGHT |
UTILITY 2 | OUTPUT | DC |
0 | 10.14/257.5 | 19.78/502.5 | 30.39/771.9 |
COM COM
FRONT
Cable entries need to be punched in the UPS cabinet. Follow diagram for correct orientation of power and control cables to be led into the UPS.
Installation Guide APC Silcon | 11 |