
External Connection
4.6.3.7 Installation of Batteries
See Installation Guide for Battery Cabinet for:
•Preparing Batteries and UPS
•Dimensions and Weight
•Connecting Batteries
WARNING!
Before proceding, ensure that power supplies have been disconnected from UPS for a minimum of 5 minutes.
CAUTION!
Follow
Diagram - UPS with Battery Cabinet
System Integration Interface
APC Silcon
UPS
Battery Breaker trip for EPO
APC Silcon Battery Cabinet
38 | Installation Guide APC Silcon |