External Connection

4.8.1 EPO Principle

Diagram for Emergency Power Off (EPO) principle has to be established prior to EPO and UPS installations. Battery Breaker Box and switch gear must be installed with “shunt trip”.

Use external power supply from “Utility” and UPS output before reaching Q002, when tripping Battery Breakers and switchgear.

EPO circuit and UPS are interconnected to “OFF” and “ON” push buttons, through the System Integration Interface card terminals X001. On the System Integration Interface card, the selection switch S002 for internal or external power supply may be set.

S002

Choose either:

Emergency shutdown connection between:

Position 1, internal supply

X001:3 and X001:4

Position 2, external supply

X001:1, + 12V and X001:2, GND

EPO switches must have break functions. Supply current loop of 20mA internally or externally by selecting switch S002 on System Integration Interface. Use external supply with 12Vdc or 20mA current generator.

The EPO switch is interconnected to an electronic control system (not available from APC) supplying the Battery Breaker Box and switch gear tripping function with an external 480/ 277Vac 50/60Hz supply from Utility 2 (if available) or Utility 1 and UPS output before Q002.

The combination of 2 break functions (one for UPS system and one for external switch gear) allows for a quick system shutdown in an emergency situation.

NOTICE!

Emergency Power Off function requires a special Service Bypass Panel with tripp function breakers.

990-4049

42

Installation Guide APC Silcon 240-320kW 480V UPS

Image 42
Contents APC Silcon 240-320kW 480V UPS Installation Guide Copyright 2001 APC Denmark ApSInstallation Guide APC Silcon 240-320kW 480V UPS Safety Symbols used in this manualThank You Contents Installation Guide APC Silcon 240-320kW 480V UPS Tools and Equipment IntroductionIntroduction ToolsUnpacking/Identification of Equipment Unpacking/Identification of EquipmentBattery Cabinet Service Bypass PanelBattery Breaker Box Main UPS systemNema 12 Cover Isolation TransformerSeismic Anchoring Remote DisplayDimensions and Weight InstallationInstallation Requirements on SiteFootprints UPS Cabinet FootprintsConduit Entrance Plate in bottom of the system COM COM FrontTop Cable Entry Connecting the UPS External ConnectionExternal Connection Connecting AC and DC Power Cables Dual Utility Connection Dual Utility Connection Seperation of AC from DC1 and DC2 Top or Bottom Cable Entry Dual and Single Utility Supply Working Principle of Dual Utility 2 utility supplies Working Principle of Single Utility 1 utility supplySwitching from Dual to Single Utility Input Wiring Terminals Input Battery Output System earth Type Stud sizeStud size M10 M12 Terminal Ground terminals System Integration Interface Single Utility Dual UtilityConnecting the System Integration Interface Board SII-board SII BoardExternal Connection External Connection External Connection Parallel Board Parallel BoardPower Cables External Control CablesRelays Relay Number Message Alarm Trigging EventsRelay Board Relay Board FunctionsExternal Connection Cable Sizes Communication Interface / Smart Slot SmartSlot for APC Silcon 240-320kW UPSConnections Priority of APC accessories SmartSlot AccessoriesMultiple SmartSlot Installation introduction Installing accessories procedureInstallation in APC Silcon 240kW and 320kW APC Silcon Battery Cabinets Important Safety InstructionsInstallation of Batteries APC SilconBattery Breaker Box Rear of enclosure Mounting and Connection of Battery Breaker BoxInterconnection See measurementsUPS Installations in Computer Rooms UPS with External Battery via Battery Breaker BoxEPO Principle S002 Choose either Emergency shutdown connection betweenPrinciple diagram UPSEmergency Power Off EPO for UPS Utility Possible UPS operation TrippingSupply Single configuration for Single Utility Utility Possible UPS operation modes Tripping SupplyProgramming Parameter Setting CommentsProgramming ParametersProgramming Example Switch to Bypass Operation Programming KeysProgramming 346V System Configuration438V 326VSeparate Programming Example Change Boost Charge Voltage toProgramming Description of Settings Programming Parameters for Advanced Parallel OperationProgramming Example Battery Monitor Options/Accessories Options/AccessoriesPrinciple diagram Service Bypass Panel for single operation Battery Breaker Box APC Silcon UPS System Integration Interface Mounting and Connecting Service Bypass Panel Options/Accessories Options/Accessories Mounting and Connecting Seismic Anchoring Mounting Seismic Anchoring Nema 12 Cover IP31 Mounting Nema 12 CoverRemote Display Extension of Remote Display Communication DistanceStandard Short-haul RS232 Modem Async Connections With Converter Connections Without ConverterHost DTE Remote Display DTE Pin Connections for cable from host to ME800A-R2 HostRemote Display Power Supply Screws DP9-FRemote Display Cables Communication FaultRemote Display Setting Remote Display UseIsolation Transformer Module External Temperature Alarm Cable Cabinets and DimensionsConnecting Isolation Transformer FootprintsIsolation Transformer Diagram Delta WYE configuration Dyn11 Isolation Transformer Grounding 6.5.7.1 System GroundingSingle Utility and Redundant System Dual Utility and Single System Dual Utility and Redundant SystemIntersystem Synchronization Unit Intersystem Synchronization Unit System ISU SystemIntersystem Synchronization Unit ISU Technical Data System SpecificationsSystem Specifications Voltage 3x480VInstallation Planning Data AppendixAppendix Fepw TBS,SA RH,RHW Correction Factors Warranty WarrantyAPC Silcon Series Limited Factory Warranty APC Corporate How to Contact APCHow to Contact APC APC Denmark