American Power Conversion 60kW InfraStruXureTM System manual Basic Installation Procedure

Page 19

Basic Installation Procedure

This section provides the basic steps that you need to perform when installing InfraStruXure power and rack components. Follow the references provided with each step for detailed instructions.

Do not begin installing your InfraStruXure system without an APC Field Service Engineer present.

Warning

1.Unpack the components according to the unpacking instructions included on the outside of the packaging or in the component’s manual.

Search all boxes and packaging to make sure that they are empty before discarding.

Note

2.Determine the correct placement of your system components by studying your InfraStruXure Configure-To-Order (CTO) report. Move the InfraStruXure PDU and NetShelter VX Enclosures to their final location.

If installing InfraStruXure on a raised floor, make sure that the raised- floor structure has a lb/in2 rating that will support the full weight of the

Warning InfraStruXure installation. See “Weight Considerations” on page 7.

3. Level the PDU and NetShelter enclosures, using the 13/14-mm wrench included with each unit.

See page 13 for detailed instructions.

4. Join adjacent NetShelter enclosures.

For instructions on joining adjacent NetShelter VX Enclosures, see the installation manual included with your enclosures.

See also

5. Ensure total power off.

See page 33 for detailed instructions.

6.Connect the power source to the PDU.

A licensed electrician must connect the power source.

See page 14 for detailed instructions.

7. Connect an EPO switch to the PDU monitoring unit.

See page 18 for detailed instructions.

InfraStruXure System—Installation and Start-Up

11

Image 19
Contents Installation and Start-Up Page About this Manual Page Contents Start-Up Procedure Appendix a Operation Page Cross-reference symbols used in this manual Safety symbols used in this manualOverview Receiving/moving Installation/MaintenanceEmergency Power Off EPO Total Power OffPage InfraStruXure PDU DimensionsNetShelter VX Enclosure Space Considerations Component Maximum Weight Weight ConsiderationsHeat Output 208V Input 480V Input 600V Input Electrical Requirements and SpecificationsProcedures requiring a licensed electrician Electrical requirementsOverview Emergency Power Off EPOLicensed electrician must connect the power source Basic Installation ProcedureSite Planning Basic Installation Procedure Level the PDU and NetShelter Enclosures Installation ProceduresAccess the PDU Main Input switch Connect the Power Source to the PDUAttach conduit to the PDU for the input conductors Installation Procedures Connect the Power Source to the PDU Torque specs and tools required Install a circuit breakerTerminal Torque Tools 208V input without a transformer Connect input conductorsContact closure 24VAC 24VDC Contact closure is recommended Connect an Emergency Power Off SwitchContact Closure-Normally Closed Contact Closure-Normally Open24VAC/VDC-Normally Open Problem Action Safety warnings Overview Relay output specifications How to connect contacts to the PDU Monitoring Unit990-1393B Cable Ladders for overhead wiring across rows Install the InfraStruXure Manager and Hub or Switch Install InfraStruXure Rack-Mount DevicesInstall the Rack Automatic Transfer Switches ATS Install the Rack Power Distribution Units PDURoute and attach power cables to equipment racks Route and Attach Overhead WiringInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Installation Procedures Wiring Under the Floor Route Data Cables to the InfraStruXure Manager Hub or Switch Ensure that all power is off Start-Up ProcedureApply power to the system Start-Up Procedure InfraStruXure System Configure the InfraStruXure Manager Appendix a Operation How to Apply Power to the SystemDistribution panel circuit breakers For PDU with transformer Set the Main How to Ensure Total Power OffPage Changes by page number General changesPage Index InfraStruXure System-Installation and Start-Up Page Page Page Page Page Page Page 990-1638B

60kW InfraStruXureTM System specifications

The American Power Conversion (APC) 60kW InfraStruXure™ System represents a groundbreaking advancement in power management for critical facilities. Designed for data centers and environments with extensive IT infrastructure, this system stands out for its scalability, reliability, and efficiency.

One of the primary features of the InfraStruXure™ System is its modular architecture. This design allows for the deployment of power and cooling components in a customized manner, tailored to the specific needs of each facility. The system can grow alongside business needs, accommodating increased power demands simply by adding additional capacity modules. This flexibility means that organizations can adapt without the often hefty costs and complexities associated with traditional infrastructure upgrades.

The 60kW configuration supports a range of power distribution options, ensuring that it can serve diverse loads while maintaining optimal performance. The system includes integrated power distribution units, which facilitate seamless integration with existing setups. This integration is crucial for organizations wishing to enhance their infrastructure without undergoing extensive overhauls.

Moreover, the InfraStruXure™ System leverages advanced cooling technologies to maintain operational efficiency. Its intelligent cooling systems optimize airflow management, helping to prevent hotspots and maintain an even thermal profile throughout the data center. The cooling units are designed to work in conjunction with the power modules, ensuring that the entire system operates with minimal energy wastage.

In terms of monitoring and management, the InfraStruXure™ System is equipped with an intuitive interface that provides real-time visibility into system performance. This includes alerts and status updates that enable quick responses to potential issues, ensuring high levels of uptime. The integration of remote monitoring capabilities allows facility managers to keep an eye on performance from anywhere, further enhancing operational management.

Reliability is another cornerstone of the InfraStruXure™ System. Built-in redundancy features minimize the risk of downtime, while the rugged reliability of APC products ensures long-term performance. Power quality management features protect sensitive equipment from surges and disruptions, critical in environments where every second of uptime counts.

In conclusion, the APC 60kW InfraStruXure™ System is a state-of-the-art solution designed to meet the evolving demands of modern data centers. With its modular design, robust power distribution, intelligent cooling, and advanced monitoring capabilities, it offers organizations an efficient, reliable, and scalable power management solution that stands up to the challenges of today’s technology-driven world.