Installation Procedures: Connect an Emergency Power Off Switch

3.Test the EPO switch to ensure that it is wired and working correctly:

a.Place the Arm/Test rocker switch in the Test position. The EPO state LEDs will be off and the PDU display interface will show the following alarm (in addition to any other active alarms):

Active Alarm xxofxx

EPO Ready To Test

b.Engage the EPO switch. (If your switch is momentary, engage it with one person watching the EPO state LEDs, and another at the EPO switch.)

c.Observe the EPO LEDs. If the switch is wired and working properly, when the switch is engaged, both of the EPO state LEDs are red.

d.If the test was successful, place the Arm/Test rocker switch back to the Arm position. The PDU display interface will clear the EPO test mode alarm. If the test was not successful, see the troubleshooting chart:

Problem

Action

 

 

Neither state LED was red when

• Check the wiring to your EPO switch.

EPO switch was engaged

• Check to make sure the EPO DIP switch

 

 

configuration is correct for your switch

 

(NO or NC). See step 2 on the previous page for

 

proper configuration instructions.

 

 

Only one of the state LEDs was

• Check to make sure the EPO DIP switch

red when EPO switch was

configuration is correct for your switch

engaged

(NO or NC) and test again. See step 2 on the

 

previous page for proper configuration

 

instructions.

 

• If the switch is configured correctly and both

 

LEDs are not red after testing again, contact

 

customer support at a number on the back cover

 

of this manual.

 

 

e. Repeat this test for each EPO switch installed.

4.Ensure that the Arm/Test rocker switch is in the Arm position on the monitoring unit.

20

InfraStruXure System—Installation and Start-Up

Image 28
Contents Installation and Start-Up Page About this Manual Page Contents Start-Up Procedure Appendix a Operation Page Cross-reference symbols used in this manual Safety symbols used in this manualOverview Installation/Maintenance Receiving/movingTotal Power Off Emergency Power Off EPOPage InfraStruXure PDU DimensionsNetShelter VX Enclosure Space Considerations Weight Considerations Component Maximum WeightHeat Output Electrical Requirements and Specifications Procedures requiring a licensed electricianElectrical requirements 208V Input 480V Input 600V InputEmergency Power Off EPO OverviewBasic Installation Procedure Licensed electrician must connect the power sourceSite Planning Basic Installation Procedure Installation Procedures Level the PDU and NetShelter EnclosuresAccess the PDU Main Input switch Connect the Power Source to the PDUAttach conduit to the PDU for the input conductors Installation Procedures Connect the Power Source to the PDU Torque specs and tools required Install a circuit breakerTerminal Torque Tools Connect input conductors 208V input without a transformerConnect an Emergency Power Off Switch Contact closure 24VAC 24VDC Contact closure is recommendedContact Closure-Normally Closed Contact Closure-Normally Open24VAC/VDC-Normally Open Problem Action Safety warnings Overview How to connect contacts to the PDU Monitoring Unit Relay output specifications990-1393B Cable Ladders for overhead wiring across rows Install InfraStruXure Rack-Mount Devices Install the Rack Automatic Transfer Switches ATSInstall the Rack Power Distribution Units PDU Install the InfraStruXure Manager and Hub or SwitchRoute and Attach Overhead Wiring Route and attach power cables to equipment racksInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Installation Procedures Wiring Under the Floor Route Data Cables to the InfraStruXure Manager Hub or Switch Start-Up Procedure Ensure that all power is offApply power to the system Start-Up Procedure InfraStruXure System Configure the InfraStruXure Manager How to Apply Power to the System Appendix a OperationDistribution panel circuit breakers How to Ensure Total Power Off For PDU with transformer Set the MainPage General changes Changes by page numberPage Index InfraStruXure System-Installation and Start-Up Page Page Page Page Page Page Page 990-1638B

60kW InfraStruXureTM System specifications

The American Power Conversion (APC) 60kW InfraStruXure™ System represents a groundbreaking advancement in power management for critical facilities. Designed for data centers and environments with extensive IT infrastructure, this system stands out for its scalability, reliability, and efficiency.

One of the primary features of the InfraStruXure™ System is its modular architecture. This design allows for the deployment of power and cooling components in a customized manner, tailored to the specific needs of each facility. The system can grow alongside business needs, accommodating increased power demands simply by adding additional capacity modules. This flexibility means that organizations can adapt without the often hefty costs and complexities associated with traditional infrastructure upgrades.

The 60kW configuration supports a range of power distribution options, ensuring that it can serve diverse loads while maintaining optimal performance. The system includes integrated power distribution units, which facilitate seamless integration with existing setups. This integration is crucial for organizations wishing to enhance their infrastructure without undergoing extensive overhauls.

Moreover, the InfraStruXure™ System leverages advanced cooling technologies to maintain operational efficiency. Its intelligent cooling systems optimize airflow management, helping to prevent hotspots and maintain an even thermal profile throughout the data center. The cooling units are designed to work in conjunction with the power modules, ensuring that the entire system operates with minimal energy wastage.

In terms of monitoring and management, the InfraStruXure™ System is equipped with an intuitive interface that provides real-time visibility into system performance. This includes alerts and status updates that enable quick responses to potential issues, ensuring high levels of uptime. The integration of remote monitoring capabilities allows facility managers to keep an eye on performance from anywhere, further enhancing operational management.

Reliability is another cornerstone of the InfraStruXure™ System. Built-in redundancy features minimize the risk of downtime, while the rugged reliability of APC products ensures long-term performance. Power quality management features protect sensitive equipment from surges and disruptions, critical in environments where every second of uptime counts.

In conclusion, the APC 60kW InfraStruXure™ System is a state-of-the-art solution designed to meet the evolving demands of modern data centers. With its modular design, robust power distribution, intelligent cooling, and advanced monitoring capabilities, it offers organizations an efficient, reliable, and scalable power management solution that stands up to the challenges of today’s technology-driven world.