American Power Conversion 60kW InfraStruXureTM System manual Start-Up Procedure

Page 6

Route the input conductors to the

Main Input circuit breaker (or switch) . . . . . . . . . . . . . . . . . 16

Torque specs and tools required . . . . . . . . . . . . . . . . . . . . 16

Connect input conductors . . . . . . . . . . . . . . . . . . . . . . . . 17

Connect an Emergency Power Off Switch . . . . . . . . . . . . . . . . 18

Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

Connect an EPO switch to the

user connection plate and test the switch . . . . . . . . . . . . . . 18 Safety warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

Connect User Input Contacts and

Relay Outputs to the User Connection Plate. . . . . . . . . . . . . . . 21

Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

How to connect contacts to the PDU Monitoring Unit . . . . . . 22

Install Shielding Troughs,

Shielding Partitions, and Cable Ladders . . . . . . . . . . . . . . . . . . 23

Shielding Troughs and Shielding Partitions for

overhead wiring along rows . . . . . . . . . . . . . . . . . . . . . . . 23 Cable Ladders for overhead wiring across rows . . . . . . . . . . 24

Install InfraStruXure Rack-Mount Devices . . . . . . . . . . . . . . . . . 25

Install the Rack Automatic Transfer Switches (ATS) . . .

. . . . . 25

Install the Rack Power Distribution Units (PDU)

. . . . . 25

Install the InfraStruXure Manager and Hub (or Switch)

. . . . . 25

Install the Environmental Monitoring Unit or

 

Environmental Management System

. . . . . 25

Route and Attach Overhead Wiring

. . . . . . . . . . . . 26

Wiring Under the Floor

. . . . . . . . . . . . 29

Route Data Cables to the

 

InfraStruXure Manager Hub (or Switch)

. . . . . . . . . . . . 31

Start-Up Procedure

33

Safety warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

Ensure that all power is off . . . . . . . . . . . . . . . . . . . . . . . . 33

Apply power to the system . . . . . . . . . . . . . . . . . . . . . . . . 34

Configure the InfraStruXure Manager. . . . . . . . . . . . . . . . . . . . 36

iv

InfraStruXure System—Installation and Start-Up

Image 6
Contents Installation and Start-Up Page About this Manual Page Contents Start-Up Procedure Appendix a Operation Page Safety symbols used in this manual Cross-reference symbols used in this manualOverview Installation/Maintenance Receiving/movingTotal Power Off Emergency Power Off EPOPage Dimensions InfraStruXure PDUNetShelter VX Enclosure Space Considerations Weight Considerations Component Maximum WeightHeat Output Electrical requirements Electrical Requirements and SpecificationsProcedures requiring a licensed electrician 208V Input 480V Input 600V InputEmergency Power Off EPO OverviewBasic Installation Procedure Licensed electrician must connect the power sourceSite Planning Basic Installation Procedure Installation Procedures Level the PDU and NetShelter EnclosuresConnect the Power Source to the PDU Access the PDU Main Input switchAttach conduit to the PDU for the input conductors Installation Procedures Connect the Power Source to the PDU Install a circuit breaker Torque specs and tools requiredTerminal Torque Tools Connect input conductors 208V input without a transformerConnect an Emergency Power Off Switch Contact closure 24VAC 24VDC Contact closure is recommendedContact Closure-Normally Open Contact Closure-Normally Closed24VAC/VDC-Normally Open Problem Action Safety warnings Overview How to connect contacts to the PDU Monitoring Unit Relay output specifications990-1393B Cable Ladders for overhead wiring across rows Install the Rack Power Distribution Units PDU Install InfraStruXure Rack-Mount DevicesInstall the Rack Automatic Transfer Switches ATS Install the InfraStruXure Manager and Hub or SwitchRoute and Attach Overhead Wiring Route and attach power cables to equipment racksInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Installation Procedures Wiring Under the Floor Route Data Cables to the InfraStruXure Manager Hub or Switch Start-Up Procedure Ensure that all power is offApply power to the system Start-Up Procedure InfraStruXure System Configure the InfraStruXure Manager How to Apply Power to the System Appendix a OperationDistribution panel circuit breakers How to Ensure Total Power Off For PDU with transformer Set the MainPage General changes Changes by page numberPage Index InfraStruXure System-Installation and Start-Up Page Page Page Page Page Page Page 990-1638B