American Power Conversion 60kW InfraStruXureTM System manual

Page 33

Installation Procedures: Install Shielding Troughs, Shielding Partitions,

Shielding Partitions. There are two types of Shielding Partitions, each of which forms a side wall of a trough for data cables. You can customize the width of the trough for each row of your system — wider for rows carrying many data cables, narrower for rows carrying fewer.

• As the back wall, use a Shielding Partition that contains an opening for routing data cables.

• As the front wall, use a solid Shielding Partition to hide data cables for a clean appearance.

Cable Ladders for overhead wiring across rows

After installing the Shielding Troughs and Shielding Partitions, install the Cable Ladders between rows of enclosures. You can also run Cable Ladders across Shielding Troughs in the same row, using the hardware provided in the ladder kit.

For more information on installing the Cable Ladders, see the instruction sheet included with the Cable Ladders (990-1576).

See also

Use wide Cable Ladders (12in; 30.5cm) where many power cables or data cables will run between rows; use narrow Cable Ladders (6in; 15.2cm) where few power cables or data cables will run between rows.

The Cable Ladders are 9feet, 8inches long. You can adjust the length of the Cable Ladders in the following ways:

Cut the ends with a hacksaw to shorten them.

Insert the connectors only partially into the side rails to extend them.

Do not change the spacing between rows or the length and position of the Cable

Ladders from the layout you planned with your APC representative when you placed Note your order. For overhead wiring, each PDU power cable is provided at a pre-determined

length. Changes to the physical configuration of your system could cause some PDU power cables to be too short or too long.

InfraStruXure System—Installation and Start-Up

25

Image 33
Contents Installation and Start-Up Page About this Manual Page Contents Start-Up Procedure Appendix a Operation Page Safety symbols used in this manual Cross-reference symbols used in this manualOverview Receiving/moving Installation/MaintenanceEmergency Power Off EPO Total Power OffPage Dimensions InfraStruXure PDUNetShelter VX Enclosure Space Considerations Component Maximum Weight Weight ConsiderationsHeat Output Procedures requiring a licensed electrician Electrical Requirements and SpecificationsElectrical requirements 208V Input 480V Input 600V InputOverview Emergency Power Off EPOLicensed electrician must connect the power source Basic Installation ProcedureSite Planning Basic Installation Procedure Level the PDU and NetShelter Enclosures Installation ProceduresConnect the Power Source to the PDU Access the PDU Main Input switchAttach conduit to the PDU for the input conductors Installation Procedures Connect the Power Source to the PDU Install a circuit breaker Torque specs and tools requiredTerminal Torque Tools 208V input without a transformer Connect input conductorsContact closure 24VAC 24VDC Contact closure is recommended Connect an Emergency Power Off SwitchContact Closure-Normally Open Contact Closure-Normally Closed24VAC/VDC-Normally Open Problem Action Safety warnings Overview Relay output specifications How to connect contacts to the PDU Monitoring Unit990-1393B Cable Ladders for overhead wiring across rows Install the Rack Automatic Transfer Switches ATS Install InfraStruXure Rack-Mount DevicesInstall the Rack Power Distribution Units PDU Install the InfraStruXure Manager and Hub or SwitchRoute and attach power cables to equipment racks Route and Attach Overhead WiringInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Installation Procedures Wiring Under the Floor Route Data Cables to the InfraStruXure Manager Hub or Switch Ensure that all power is off Start-Up ProcedureApply power to the system Start-Up Procedure InfraStruXure System Configure the InfraStruXure Manager Appendix a Operation How to Apply Power to the SystemDistribution panel circuit breakers For PDU with transformer Set the Main How to Ensure Total Power OffPage Changes by page number General changesPage Index InfraStruXure System-Installation and Start-Up Page Page Page Page Page Page Page 990-1638B

60kW InfraStruXureTM System specifications

The American Power Conversion (APC) 60kW InfraStruXure™ System represents a groundbreaking advancement in power management for critical facilities. Designed for data centers and environments with extensive IT infrastructure, this system stands out for its scalability, reliability, and efficiency.

One of the primary features of the InfraStruXure™ System is its modular architecture. This design allows for the deployment of power and cooling components in a customized manner, tailored to the specific needs of each facility. The system can grow alongside business needs, accommodating increased power demands simply by adding additional capacity modules. This flexibility means that organizations can adapt without the often hefty costs and complexities associated with traditional infrastructure upgrades.

The 60kW configuration supports a range of power distribution options, ensuring that it can serve diverse loads while maintaining optimal performance. The system includes integrated power distribution units, which facilitate seamless integration with existing setups. This integration is crucial for organizations wishing to enhance their infrastructure without undergoing extensive overhauls.

Moreover, the InfraStruXure™ System leverages advanced cooling technologies to maintain operational efficiency. Its intelligent cooling systems optimize airflow management, helping to prevent hotspots and maintain an even thermal profile throughout the data center. The cooling units are designed to work in conjunction with the power modules, ensuring that the entire system operates with minimal energy wastage.

In terms of monitoring and management, the InfraStruXure™ System is equipped with an intuitive interface that provides real-time visibility into system performance. This includes alerts and status updates that enable quick responses to potential issues, ensuring high levels of uptime. The integration of remote monitoring capabilities allows facility managers to keep an eye on performance from anywhere, further enhancing operational management.

Reliability is another cornerstone of the InfraStruXure™ System. Built-in redundancy features minimize the risk of downtime, while the rugged reliability of APC products ensures long-term performance. Power quality management features protect sensitive equipment from surges and disruptions, critical in environments where every second of uptime counts.

In conclusion, the APC 60kW InfraStruXure™ System is a state-of-the-art solution designed to meet the evolving demands of modern data centers. With its modular design, robust power distribution, intelligent cooling, and advanced monitoring capabilities, it offers organizations an efficient, reliable, and scalable power management solution that stands up to the challenges of today’s technology-driven world.