American Power Conversion 60kW InfraStruXureTM System manual Configure the InfraStruXure Manager

Page 44

Configure the InfraStruXure Manager

Once all equipment is installed, the network cables are connected to the InfraStruXure Manager hub (or switch), and start-up of the system is complete, configure the InfraStruXure Manager.

See also

Note

For instructions, see the InfraStruXure Manager Installation and Quick-Start

manual included with your InfraStruXure Manager.

If you use PowerChute Network Shutdown (PCNS) software with your InfraStruXure UPS, your UPS must have a connection to the “User LAN” (public network) for PCNS to function correctly. If the Network Management Card installed in your UPS is connected to the InfraStruXure Manager’s “APC LAN,” you must install a second Network Management Card in your UPS and connect it to the “User LAN” (public network) to use PCNS.

36

InfraStruXure System—Installation and Start-Up

Image 44
Contents Installation and Start-Up Page About this Manual Page Contents Start-Up Procedure Appendix a Operation Page Overview Safety symbols used in this manualCross-reference symbols used in this manual Installation/Maintenance Receiving/movingTotal Power Off Emergency Power Off EPOPage NetShelter VX Enclosure DimensionsInfraStruXure PDU Space Considerations Weight Considerations Component Maximum WeightHeat Output Electrical Requirements and Specifications Procedures requiring a licensed electricianElectrical requirements 208V Input 480V Input 600V InputEmergency Power Off EPO OverviewBasic Installation Procedure Licensed electrician must connect the power sourceSite Planning Basic Installation Procedure Installation Procedures Level the PDU and NetShelter EnclosuresAttach conduit to the PDU for the input conductors Connect the Power Source to the PDUAccess the PDU Main Input switch Installation Procedures Connect the Power Source to the PDU Terminal Torque Tools Install a circuit breakerTorque specs and tools required Connect input conductors 208V input without a transformerConnect an Emergency Power Off Switch Contact closure 24VAC 24VDC Contact closure is recommended24VAC/VDC-Normally Open Contact Closure-Normally OpenContact Closure-Normally Closed Problem Action Safety warnings Overview How to connect contacts to the PDU Monitoring Unit Relay output specifications990-1393B Cable Ladders for overhead wiring across rows Install InfraStruXure Rack-Mount Devices Install the Rack Automatic Transfer Switches ATSInstall the Rack Power Distribution Units PDU Install the InfraStruXure Manager and Hub or SwitchRoute and Attach Overhead Wiring Route and attach power cables to equipment racksInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Installation Procedures Wiring Under the Floor Route Data Cables to the InfraStruXure Manager Hub or Switch Start-Up Procedure Ensure that all power is offApply power to the system Start-Up Procedure InfraStruXure System Configure the InfraStruXure Manager How to Apply Power to the System Appendix a OperationDistribution panel circuit breakers How to Ensure Total Power Off For PDU with transformer Set the MainPage General changes Changes by page numberPage Index InfraStruXure System-Installation and Start-Up Page Page Page Page Page Page Page 990-1638B