American Power Conversion
60kW InfraStruXureTM System
manual
Specification
Install
Wiring Under the Floor
Dimension
Problem Action
Start-Up Procedure
Weight
How to
Safety
Total Power Off
Page 57
Page 56
Page 58
Image 57
Page 56
Page 58
Contents
Installation and Start-Up
Page
About this Manual
Page
Contents
Start-Up Procedure
Appendix a Operation
Page
Safety symbols used in this manual
Cross-reference symbols used in this manual
Overview
Receiving/moving
Installation/Maintenance
Emergency Power Off EPO
Total Power Off
Page
Dimensions
InfraStruXure PDU
NetShelter VX Enclosure
Space Considerations
Component Maximum Weight
Weight Considerations
Heat Output
Procedures requiring a licensed electrician
Electrical Requirements and Specifications
Electrical requirements
208V Input 480V Input 600V Input
Overview
Emergency Power Off EPO
Licensed electrician must connect the power source
Basic Installation Procedure
Site Planning Basic Installation Procedure
Level the PDU and NetShelter Enclosures
Installation Procedures
Connect the Power Source to the PDU
Access the PDU Main Input switch
Attach conduit to the PDU for the input conductors
Installation Procedures Connect the Power Source to the PDU
Install a circuit breaker
Torque specs and tools required
Terminal Torque Tools
208V input without a transformer
Connect input conductors
Contact closure 24VAC 24VDC Contact closure is recommended
Connect an Emergency Power Off Switch
Contact Closure-Normally Open
Contact Closure-Normally Closed
24VAC/VDC-Normally Open
Problem Action
Safety warnings
Overview
Relay output specifications
How to connect contacts to the PDU Monitoring Unit
990-1393B
Cable Ladders for overhead wiring across rows
Install the Rack Automatic Transfer Switches ATS
Install InfraStruXure Rack-Mount Devices
Install the Rack Power Distribution Units PDU
Install the InfraStruXure Manager and Hub or Switch
Route and attach power cables to equipment racks
Route and Attach Overhead Wiring
Installation Procedures Route and Attach Overhead Wiring
Installation Procedures Route and Attach Overhead Wiring
Wiring Under the Floor
Installation Procedures Wiring Under the Floor
Route Data Cables to the InfraStruXure Manager Hub or Switch
Ensure that all power is off
Start-Up Procedure
Apply power to the system
Start-Up Procedure InfraStruXure System
Configure the InfraStruXure Manager
Appendix a Operation
How to Apply Power to the System
Distribution panel circuit breakers
For PDU with transformer Set the Main
How to Ensure Total Power Off
Page
Changes by page number
General changes
Page
Index
InfraStruXure System-Installation and Start-Up
Page
Page
Page
Page
Page
Page
Page
990-1638B
Top
Page
Image
Contents