Appendix A: Operation

How to Apply Power to the System

This procedure instructs on how to apply power to a system that has already been installed. For initial start-up instructions, see the Start-up section of this manual.

1. Close (turn ON) the main circuit breaker of the power source supplying power to the PDU.

2. Set the Main Input on the PDU to ON.

3. Power the PDU distribution circuit breakers: a. For PDU with transformer: Set the Main Output circuit breaker on the PDU to ON.

After the Main Output breaker has been closed, both PDU distribution panels will be energized.

Note

InfraStruXure System—Installation and Start-Up

37

Image 45
Contents Installation and Start-Up Page About this Manual Page Contents Start-Up Procedure Appendix a Operation Page Safety symbols used in this manual Cross-reference symbols used in this manualOverview Receiving/moving Installation/MaintenanceEmergency Power Off EPO Total Power OffPage Dimensions InfraStruXure PDUNetShelter VX Enclosure Space Considerations Component Maximum Weight Weight ConsiderationsHeat Output Procedures requiring a licensed electrician Electrical Requirements and SpecificationsElectrical requirements 208V Input 480V Input 600V InputOverview Emergency Power Off EPOLicensed electrician must connect the power source Basic Installation ProcedureSite Planning Basic Installation Procedure Level the PDU and NetShelter Enclosures Installation ProceduresConnect the Power Source to the PDU Access the PDU Main Input switchAttach conduit to the PDU for the input conductors Installation Procedures Connect the Power Source to the PDU Install a circuit breaker Torque specs and tools requiredTerminal Torque Tools 208V input without a transformer Connect input conductorsContact closure 24VAC 24VDC Contact closure is recommended Connect an Emergency Power Off SwitchContact Closure-Normally Open Contact Closure-Normally Closed24VAC/VDC-Normally Open Problem Action Safety warnings Overview Relay output specifications How to connect contacts to the PDU Monitoring Unit990-1393B Cable Ladders for overhead wiring across rows Install the Rack Automatic Transfer Switches ATS Install InfraStruXure Rack-Mount DevicesInstall the Rack Power Distribution Units PDU Install the InfraStruXure Manager and Hub or SwitchRoute and attach power cables to equipment racks Route and Attach Overhead WiringInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Installation Procedures Wiring Under the Floor Route Data Cables to the InfraStruXure Manager Hub or Switch Ensure that all power is off Start-Up Procedure Apply power to the system Start-Up Procedure InfraStruXure System Configure the InfraStruXure Manager Appendix a Operation How to Apply Power to the SystemDistribution panel circuit breakers For PDU with transformer Set the Main How to Ensure Total Power OffPage Changes by page number General changesPage Index InfraStruXure System-Installation and Start-Up Page Page Page Page Page Page Page 990-1638B