American Power Conversion
60kW InfraStruXureTM System
manual
Specifications
Install
Wiring Under the Floor
Dimension
Problem Action
Start-Up Procedure
Weight
How to
Safety
Total Power Off
Page 2
Page 1
Page 3
Image 2
Page 1
Page 3
Contents
Installation and Start-Up
Page
About this Manual
Page
Contents
Start-Up Procedure
Appendix a Operation
Page
Overview
Safety symbols used in this manual
Cross-reference symbols used in this manual
Installation/Maintenance
Receiving/moving
Total Power Off
Emergency Power Off EPO
Page
NetShelter VX Enclosure
Dimensions
InfraStruXure PDU
Space Considerations
Weight Considerations
Component Maximum Weight
Heat Output
Electrical requirements
Electrical Requirements and Specifications
Procedures requiring a licensed electrician
208V Input 480V Input 600V Input
Emergency Power Off EPO
Overview
Basic Installation Procedure
Licensed electrician must connect the power source
Site Planning Basic Installation Procedure
Installation Procedures
Level the PDU and NetShelter Enclosures
Attach conduit to the PDU for the input conductors
Connect the Power Source to the PDU
Access the PDU Main Input switch
Installation Procedures Connect the Power Source to the PDU
Terminal Torque Tools
Install a circuit breaker
Torque specs and tools required
Connect input conductors
208V input without a transformer
Connect an Emergency Power Off Switch
Contact closure 24VAC 24VDC Contact closure is recommended
24VAC/VDC-Normally Open
Contact Closure-Normally Open
Contact Closure-Normally Closed
Problem Action
Safety warnings
Overview
How to connect contacts to the PDU Monitoring Unit
Relay output specifications
990-1393B
Cable Ladders for overhead wiring across rows
Install the Rack Power Distribution Units PDU
Install InfraStruXure Rack-Mount Devices
Install the Rack Automatic Transfer Switches ATS
Install the InfraStruXure Manager and Hub or Switch
Route and Attach Overhead Wiring
Route and attach power cables to equipment racks
Installation Procedures Route and Attach Overhead Wiring
Installation Procedures Route and Attach Overhead Wiring
Wiring Under the Floor
Installation Procedures Wiring Under the Floor
Route Data Cables to the InfraStruXure Manager Hub or Switch
Start-Up Procedure
Ensure that all power is off
Apply power to the system
Start-Up Procedure InfraStruXure System
Configure the InfraStruXure Manager
How to Apply Power to the System
Appendix a Operation
Distribution panel circuit breakers
How to Ensure Total Power Off
For PDU with transformer Set the Main
Page
General changes
Changes by page number
Page
Index
InfraStruXure System-Installation and Start-Up
Page
Page
Page
Page
Page
Page
Page
990-1638B
Top
Page
Image
Contents