American Power Conversion 60kW InfraStruXureTM System manual Index

Page 51

Index

A

automatic transfer switch, installing, 25

C

cable ladders, installing, 24

circuit breaker size, determining by input voltage, 2

E

electrical requirements, 9 Emergency Power Off (EPO)

connect the switch, 1820 overview, 10

troubleshooting problems with, 19

warnings, 3, 20 EMI warnings, 3

Environmental Management System

installing, 25

Environmental Monitoring Unit, installing, 25

EPO. See Emergency Power Off (EPO).

I

InfraStruXure Manager configure the, 36 installing, 25

route data cables to, 31 InfraStruXure PDU

connect the power source to, 1417

dimensions, 5

electrical requirements, 9 heat output, 8

level the, 13 maximum weight, 7 space consideration, 6

input conductors, connecting, 17

installation, 1331

basic procedure, 1112

connect the Emergency Power Off switch, 1820

connect the power source to the PDU, 1417

connect user input contacts and relay outputs to the user connection plate, 2122

install InfraStruXure rack- mount devices, 25

install shielding troughs, shielding partitions, and cable ladders, 2324

level the PDU and NetShelter Enclosures, 13

route and attach overhead wiring, 2628

route data cables to the InfraStruXure Manager, 31

wiring under the floor, 2930

M

main input switch, 3334, 39 main output circuit breaker, 35, 39 maintenance

warnings while the PDU is receiving power, 2

N

NetShelter VX Enclosure dimensions, 5 level the, 13 maximum weight, 7

O

operation, 37

how to apply power to the system, 3738

total power off, ensuring, 39

P

PDU monitoring unit, connecting contacts to, 22

PDU. See InfraStruXure PDU.

R

rack PDUs, installing, 25 rack-mount devices, installing, 25

relay outputs, connecting to the user connection plate, 21

S

safety, 13

symbols used in this manual, 1 warnings, 23

Emergency Power Off (EPO), 3

EMI, 3

for maintenance while the PDU is receiving power, 2

installation/maintenance, 2 receiving/moving, 2 total power off, 3

shielding partitions dimensions, 5 installing, 23

shielding trough dimensions, 5

shielding troughs installing, 23

site planning, 512

basic installation procedure, 1112

dimensions, 5

electrical requirements, 9

Emergency Power Off (EPO), 10

heat output, 8

space considerations, 6 weight considerations, 7

start-up procedure, 3336

apply power to the system, 3435

configure the InfraStruXure Manager, 36

ensure total power off, 33

InfraStruXure System—Installation and Start-Up

43

Image 51
Contents Installation and Start-Up Page About this Manual Page Contents Start-Up Procedure Appendix a Operation Page Safety symbols used in this manual Cross-reference symbols used in this manualOverview Receiving/moving Installation/MaintenanceEmergency Power Off EPO Total Power OffPage Dimensions InfraStruXure PDUNetShelter VX Enclosure Space Considerations Component Maximum Weight Weight ConsiderationsHeat Output 208V Input 480V Input 600V Input Electrical Requirements and SpecificationsProcedures requiring a licensed electrician Electrical requirementsOverview Emergency Power Off EPOLicensed electrician must connect the power source Basic Installation ProcedureSite Planning Basic Installation Procedure Level the PDU and NetShelter Enclosures Installation ProceduresConnect the Power Source to the PDU Access the PDU Main Input switchAttach conduit to the PDU for the input conductors Installation Procedures Connect the Power Source to the PDU Install a circuit breaker Torque specs and tools requiredTerminal Torque Tools 208V input without a transformer Connect input conductorsContact closure 24VAC 24VDC Contact closure is recommended Connect an Emergency Power Off SwitchContact Closure-Normally Open Contact Closure-Normally Closed24VAC/VDC-Normally Open Problem Action Safety warnings Overview Relay output specifications How to connect contacts to the PDU Monitoring Unit990-1393B Cable Ladders for overhead wiring across rows Install the InfraStruXure Manager and Hub or Switch Install InfraStruXure Rack-Mount DevicesInstall the Rack Automatic Transfer Switches ATS Install the Rack Power Distribution Units PDURoute and attach power cables to equipment racks Route and Attach Overhead WiringInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Installation Procedures Wiring Under the Floor Route Data Cables to the InfraStruXure Manager Hub or Switch Ensure that all power is off Start-Up ProcedureApply power to the system Start-Up Procedure InfraStruXure System Configure the InfraStruXure Manager Appendix a Operation How to Apply Power to the SystemDistribution panel circuit breakers For PDU with transformer Set the Main How to Ensure Total Power OffPage Changes by page number General changesPage Index InfraStruXure System-Installation and Start-Up Page Page Page Page Page Page Page 990-1638B

60kW InfraStruXureTM System specifications

The American Power Conversion (APC) 60kW InfraStruXure™ System represents a groundbreaking advancement in power management for critical facilities. Designed for data centers and environments with extensive IT infrastructure, this system stands out for its scalability, reliability, and efficiency.

One of the primary features of the InfraStruXure™ System is its modular architecture. This design allows for the deployment of power and cooling components in a customized manner, tailored to the specific needs of each facility. The system can grow alongside business needs, accommodating increased power demands simply by adding additional capacity modules. This flexibility means that organizations can adapt without the often hefty costs and complexities associated with traditional infrastructure upgrades.

The 60kW configuration supports a range of power distribution options, ensuring that it can serve diverse loads while maintaining optimal performance. The system includes integrated power distribution units, which facilitate seamless integration with existing setups. This integration is crucial for organizations wishing to enhance their infrastructure without undergoing extensive overhauls.

Moreover, the InfraStruXure™ System leverages advanced cooling technologies to maintain operational efficiency. Its intelligent cooling systems optimize airflow management, helping to prevent hotspots and maintain an even thermal profile throughout the data center. The cooling units are designed to work in conjunction with the power modules, ensuring that the entire system operates with minimal energy wastage.

In terms of monitoring and management, the InfraStruXure™ System is equipped with an intuitive interface that provides real-time visibility into system performance. This includes alerts and status updates that enable quick responses to potential issues, ensuring high levels of uptime. The integration of remote monitoring capabilities allows facility managers to keep an eye on performance from anywhere, further enhancing operational management.

Reliability is another cornerstone of the InfraStruXure™ System. Built-in redundancy features minimize the risk of downtime, while the rugged reliability of APC products ensures long-term performance. Power quality management features protect sensitive equipment from surges and disruptions, critical in environments where every second of uptime counts.

In conclusion, the APC 60kW InfraStruXure™ System is a state-of-the-art solution designed to meet the evolving demands of modern data centers. With its modular design, robust power distribution, intelligent cooling, and advanced monitoring capabilities, it offers organizations an efficient, reliable, and scalable power management solution that stands up to the challenges of today’s technology-driven world.