Install Shielding Troughs, Shielding Partitions, and Cable Ladders

Shielding Troughs and Shielding Partitions for overhead wiring along rows

If you ordered APC Shielding Troughs, Shielding Partitions, and Cable Ladders to route overhead wiring for your system, assemble the Shielding Troughs and the Shielding Partitions along the rows of enclosures and assemble the Cable Ladders between rows

 

For detailed installation and grounding instructions, see the instruction sheet

 

included with the Shielding Troughs and Shielding Partitions

See also

(990-1393B).

Shielding Troughs. There are two types of Shielding Troughs:

The PDU Wide Shielding Trough is 610mm in length and is not adjustable. The trough sits on top of the PDU and accommodates power cables as they exit the roof of the PDU. The PDU Shielding Trough is two pieces. The power cables sit in between the two pieces when installed on the roof of the PDU.

The NetShelter Shielding Trough is 610mm in length and is not adjustable. The Shielding Troughs haves an opening in each side through which you route data cables to the Shielding Partitions.

Shielding Trough accessories. APC offers the following accessories for Shielding Troughs:

Shielding Trough Covers for both 600-mm wide (AR8174BLK) and 750-mm wide (AR8175BLK) enclosures. Contact APC for more information.

Shielding Trough End Caps (AR8167BLK) to place on the side of a Shielding Trough at the end of a row. Contact APC for more information.

24

InfraStruXure System—Installation and Start-Up

Image 32
Contents Installation and Start-Up Page About this Manual Page Contents Start-Up Procedure Appendix a Operation Page Overview Safety symbols used in this manualCross-reference symbols used in this manual Installation/Maintenance Receiving/movingTotal Power Off Emergency Power Off EPOPage NetShelter VX Enclosure DimensionsInfraStruXure PDU Space Considerations Weight Considerations Component Maximum WeightHeat Output Electrical Requirements and Specifications Procedures requiring a licensed electricianElectrical requirements 208V Input 480V Input 600V InputEmergency Power Off EPO OverviewBasic Installation Procedure Licensed electrician must connect the power sourceSite Planning Basic Installation Procedure Installation Procedures Level the PDU and NetShelter EnclosuresAttach conduit to the PDU for the input conductors Connect the Power Source to the PDUAccess the PDU Main Input switch Installation Procedures Connect the Power Source to the PDU Terminal Torque Tools Install a circuit breakerTorque specs and tools required Connect input conductors 208V input without a transformerConnect an Emergency Power Off Switch Contact closure 24VAC 24VDC Contact closure is recommended24VAC/VDC-Normally Open Contact Closure-Normally OpenContact Closure-Normally Closed Problem Action Safety warnings Overview How to connect contacts to the PDU Monitoring Unit Relay output specifications990-1393B Cable Ladders for overhead wiring across rows Install InfraStruXure Rack-Mount Devices Install the Rack Automatic Transfer Switches ATSInstall the Rack Power Distribution Units PDU Install the InfraStruXure Manager and Hub or SwitchRoute and Attach Overhead Wiring Route and attach power cables to equipment racksInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Installation Procedures Wiring Under the Floor Route Data Cables to the InfraStruXure Manager Hub or Switch Start-Up Procedure Ensure that all power is offApply power to the system Start-Up Procedure InfraStruXure System Configure the InfraStruXure Manager How to Apply Power to the System Appendix a OperationDistribution panel circuit breakers How to Ensure Total Power Off For PDU with transformer Set the MainPage General changes Changes by page numberPage Index InfraStruXure System-Installation and Start-Up Page Page Page Page Page Page Page 990-1638B