GBC F-36 manual Startup Checklist

Page 18

Installation

F-36 PRO Laminator Operation Manual

 

 

 

The first time the laminator is started and every time it is serviced you should use the following checklist to confirm that the unit is operating properly and that all safety mechanisms are functioning.

Startup Checklist

Start the laminator and go through the following check- list.

Are the emergency stop buttons working?

Push down on one of the emergency stop buttons. The laminator should stop. Rotate and pull up on the button. Press the Reset button then press RUN on the control panel. The laminator should resume operation. Always check both buttons.

WARNING

Never operate the laminator unless both of the emergency stop buttons are functioning properly. You can be crushed or burned.

Is the guard working?

With the laminator running, pull the guard towards you. The rolls should stop. Replace the guard so that the switch is engaged. The laminator should resume operation.

WARNING

Never operate the laminator unless the guard system is functioning properly. You can be crushed or burned.

Is the motor functioning?

Test the motor at various speeds ranging from 0-18. At 0 the rolls should stop turning.

Run the motor in both forward and reverse.

Are the heaters working?

Verify that the top heater controller heats the top roll and the bottom heater controller heats the bot- tom roll.

Is the footswitch operating?

Test the footswitch for both forward and reverse operation. Verify that the footswitch overrides the photoelectric eye by pressing the footswitch and pushing an object as large as your hand into the nip area.

Once you have completed the startup checklist you can safely run a test sample.

2-8

© GBC Pro-Tech 1999 January

Image 18
Contents           GBC Pro-Tech 1999 January Preinstallation Checklist Unpacking Setup Startup    Machine Shutdown     Safety Using the Emergency Stop ButtonsGBC Pro-Tech 1999 January  & $*  *  Locations of Safety Labels Decal Meaning Position the jumpers as shown in -6 for Service choice   !     # + Installation Laminator Space Requirements +$ Tools requiredIf the laminator is in a cardboard box Foot Bolt Shipping Pad If the laminator is in a crate Removing the CrateSetup Procedure  Power Cord Connection Startup Checklist      Operation    -#   $#  $ $# $      #  Then mounted $Insert a starter board into the nip and lower     # #-Identification Diagram 34*/534*6!575 34*/5 34*6!575One-Pass Mounting and Laminating 34*/5 34*6!575One-Pass Mounting 34*/55 34*6!5755Two Pass Mount and Cold/Pressure Overlaminate, First Pass 34*/58 34*6!5758Two Pass Mount and Cold/Pressure Overlaminate, Second Pass 34*/5%5 34*6!575%5Two Pass Mount and Hot Overlaminate, First Pass 34*/5%8 34*6!575%8Two Pass Mount and Hot Overlaminate, Second Pass 34*/5 34*6!575Encapsulation   #$ Maintenance and Troubleshooting Firmly hold the thermocouple where the guitarUpper Main To clean the laminator rolls To clean beads of adhesive, dust and dirt from the rollsTo clean the cabinet and covers 9$# 4To adjust the chain tension #  $    $ #      #$7 This warranty specifically does not cover Unauthorized customer alterations will void this Warranty. &  Warranty Part Description Recommended QuantitySpecifications   Nip 1-1, 1-2, 2-6, 2-8, 3-1, 4-1, 4-4, 4-5Index