GBC F-36 manual  , Nip 1-1, 1-2, 2-6, 2-8, 3-1, 4-1, 4-4, 4-5

Page 47

F-36 PRO Laminator Operation Manual

Index

 

 

! (

5

Accessory pack 2-3

Adjusting bolt 4-5,4-6



Chain

Lubrication 4-7

Tensioning 4-6

Clutch

Common problems 4-8

Controls

Front control panel 3-2

3

Emergency stop buttons 1-1,2-8,3-1Encapsulating 6-1

Encapsulation 3-8

Environment 2-1



Film 3-4

Loading 3-3

Positioning 3-4

Foot bolt 2-4,2-5

Footswitch 1-1,1-2,2-8,3-1,4-1,4-4,6-1FWD/REV switch 4-4

7

Grease fittings 4-7

/

Handwheel 2-6,4-5

Heater 2-8

Controller 2-8

Heating 3-4

!

Infeed table 4-4

Installation requirements 2-1,6-1

*

Laminate adhesives 3-4

Laminating material 6-1

Laminating opening 6-1

Laminating rolls 6-1

Laminating speeds 6-1

Lubrication 4-7



Main roll

Lower 4-5

Main rolls 4-1,4-5

Temperature 4-1

Maintenance schedule 4-1

Motor 2-8, 4-6

Mounting and laminating (one pass) 3-5Mounting only 3-6

4

Nip 1-1, 1-2, 2-6, 2-8, 3-1, 4-1, 4-4, 4-5, 4-6



Outfeed slitters 6-1

Outfeed table 6-1



Paper 3-5

Photoelectric eye 2-7,2-8,3-1

Power requirement 2-1

Preinstallation checklist 2-1

Pressure

Laminator roll 3-3

Process control charts 3-5



Riggers 1-3, 2-4, 2-5, 2-6

© GBC Pro-Tech 1999 January

7-1

Image 47
Contents           GBC Pro-Tech 1999 January     Preinstallation Checklist Unpacking Setup StartupMachine Shutdown     Using the Emergency Stop Buttons SafetyGBC Pro-Tech 1999 January  & $*  *  Locations of Safety Labels Decal Meaning    # + Position the jumpers as shown in -6 for Service choice  !   Laminator Space Requirements InstallationIf the laminator is in a cardboard box  +$Tools required Foot Bolt Shipping Pad Removing the Crate If the laminator is in a crate  Setup ProcedurePower Cord Connection Startup Checklist          Operation $#  -# $#  $   #  $   $ Then mountedInsert a starter board into the nip and lower  # #-   34*6!575 Identification Diagram34*/5 One-Pass Mounting and Laminating 34*/534*6!575 One-Pass Mounting 34*/534*6!575 Two Pass Mount and Cold/Pressure Overlaminate, First Pass 34*/5534*6!5755 Two Pass Mount and Cold/Pressure Overlaminate, Second Pass 34*/5834*6!5758 Two Pass Mount and Hot Overlaminate, First Pass 34*/5%534*6!575%5 Two Pass Mount and Hot Overlaminate, Second Pass 34*/5%834*6!575%8 Encapsulation 34*/534*6!575   #$ Firmly hold the thermocouple where the guitar Maintenance and TroubleshootingUpper Main To clean beads of adhesive, dust and dirt from the rolls To clean the laminator rolls9$# 4 To clean the cabinet and covers#  $ To adjust the chain tension $ #        #$7 . &  This warranty specifically does not coverUnauthorized customer alterations will void this Warranty Warranty Quantity Part Description RecommendedSpecifications Nip 1-1, 1-2, 2-6, 2-8, 3-1, 4-1, 4-4, 4-5  Index