Page 22

Operation

F-36 PRO Laminator Operation Manual

 

 

￿￿￿￿￿ ..    

The F-36 PRO Laminator is capable of processing a wide range of pressure sensitive and thermal laminates onto an equally wide range of image materials. The pri- mary considerations are:

Laminate adhesives are compatible with image materials.

The materials properly activate below the maxi- mum roll temperature and within the speed and roll nip pressure ranges available on the laminator.

It is the operator’s responsibility to ensure the compati- bility and operational settings for any laminates/image material combination. GBC Pro-Tech Technical Sup- port is available at the number provided in the Mainte- nance chapter for advice on some material combinations.

/ $

Use the following instructions when heating one or both of the laminating rolls. The procedure is the same for the top and bottom heaters.

1.Set the heater switch to ON.

2.Adjust the temperature controller for the desired operating temperature using the temperature con- troller dial adjustment.

3.When heating the rolls, keep the top roll down and turning at a moderate speed to prevent uneven heating.

4.The temperature controllers have LED (light emit- ting diode) readouts on the rotary dial to indicate the status of the heating system. See Figure 3-5 to learn about the readouts.

$# .

The following procedure is applicable to both the top and bottom feed unwinds.

1. Secure the braking film mount arm so as to center

the film between the side cabinets.

Red: Set point has not been reached

Green: Temperature is exactly at set point

OUT

175

HI

 

150

200

125

 

225

100

 

250

75275

50

300

 

 

PROTECH

°F 001-133 LO

Solid: Temperature is within 5° of set point

Blinking: Temperature is greater than 5° of set point

Off: Set point has been reached or exceeded

Solid: Temperature is within 5° of set point

Blinking: Temperature is lower than 5° of set point

2.

Loosen the core support film mount arm and slide

 

it to the drive side of the machine.

3.

Install the laminating film onto the braking mount

 

arm and slide the core support arm over to support

 

the laminating film's end.

4.

Secure the support arm.

Off: Set point has been reached or exceeded

Figure 3-5: Heater Controller

5.It will take approximately 15 minutes for the lami- nating roll(s) to reach operating temperature. When the preset operating temperature has been reached, the machine is ready to use.

3-4

© GBC Pro-Tech 1999 January

Image 22
Contents           GBC Pro-Tech 1999 January Preinstallation Checklist Unpacking Setup Startup    Machine Shutdown     Safety Using the Emergency Stop ButtonsGBC Pro-Tech 1999 January  & $*  *  Locations of Safety Labels Decal Meaning   !   Position the jumpers as shown in -6 for Service choice   # + Installation Laminator Space RequirementsTools required  +$If the laminator is in a cardboard box Foot Bolt Shipping Pad If the laminator is in a crate Removing the CrateSetup Procedure  Power Cord Connection Startup Checklist      Operation    -#   $#  $ $#    $   #  Then mounted $Insert a starter board into the nip and lower     # #-34*/5 Identification Diagram34*6!575 34*6!575 34*/5One-Pass Mounting and Laminating 34*6!575 34*/5One-Pass Mounting 34*6!5755 34*/55Two Pass Mount and Cold/Pressure Overlaminate, First Pass 34*6!5758 34*/58Two Pass Mount and Cold/Pressure Overlaminate, Second Pass 34*6!575%5 34*/5%5Two Pass Mount and Hot Overlaminate, First Pass 34*6!575%8 34*/5%8Two Pass Mount and Hot Overlaminate, Second Pass 34*6!575 34*/5Encapsulation   #$ Maintenance and Troubleshooting Firmly hold the thermocouple where the guitarUpper Main To clean the laminator rolls To clean beads of adhesive, dust and dirt from the rollsTo clean the cabinet and covers 9$# 4To adjust the chain tension #  $    $ #      #$7 Unauthorized customer alterations will void this Warranty This warranty specifically does not cover. &  Warranty Part Description Recommended QuantitySpecifications   Nip 1-1, 1-2, 2-6, 2-8, 3-1, 4-1, 4-4, 4-5Index