GBC F-36 manual GBC Pro-Tech 1999 January

Page 2

F-36 PRO Laminator Operation Manual

The information in this publication is provided for reference and is believed to be accurate and complete. GBC Pro-Tech is not liable for errors in this publication or for incidental or consequential damage in connection with the furnishing or use of the information in this publication, including, but not limited to, any implied warranty of fitness or merchantabil- ity for any particular use.

GBC Pro-Tech reserves the right to make changes to this publication and to the products described in it without notice. All specifications and information concerning products are subject to change without notice.

Reference in this publication to information or products protected by copyright or patent does not convey any license under the rights of GBC Pro-Tech or others. GBC Pro-Tech assumes no liability arising from infringements of patents or any other rights of third par- ties.

This manual is copyrighted ©1999 by GBC Pro-Tech. All rights reserved. The information contained in this manual is proprietary and may not be reproduced, stored, transmitted, or transferred, in whole or in part, in any form without the prior and express written permis- sion of GBC Pro-Tech.

ii

© GBC Pro-Tech 1999 January

Image 2
Contents           GBC Pro-Tech 1999 January Preinstallation Checklist Unpacking Setup Startup    Machine Shutdown     Safety Using the Emergency Stop ButtonsGBC Pro-Tech 1999 January  & $*  *  Locations of Safety Labels Decal Meaning    # + Position the jumpers as shown in -6 for Service choice  !   Installation Laminator Space RequirementsIf the laminator is in a cardboard box  +$Tools required Foot Bolt Shipping Pad If the laminator is in a crate Removing the CrateSetup Procedure  Power Cord Connection Startup Checklist      Operation    -#   $#  $ $#    #  $   Then mounted $Insert a starter board into the nip and lower     # #-34*6!575 Identification Diagram34*/5 One-Pass Mounting and Laminating 34*/534*6!575 One-Pass Mounting 34*/534*6!575 Two Pass Mount and Cold/Pressure Overlaminate, First Pass 34*/5534*6!5755 Two Pass Mount and Cold/Pressure Overlaminate, Second Pass 34*/5834*6!5758 Two Pass Mount and Hot Overlaminate, First Pass 34*/5%534*6!575%5 Two Pass Mount and Hot Overlaminate, Second Pass 34*/5%834*6!575%8 Encapsulation 34*/534*6!575   #$ Maintenance and Troubleshooting Firmly hold the thermocouple where the guitarUpper Main To clean the laminator rolls To clean beads of adhesive, dust and dirt from the rollsTo clean the cabinet and covers 9$# 4To adjust the chain tension #  $    $ #      #$7 . &  This warranty specifically does not coverUnauthorized customer alterations will void this Warranty Warranty Part Description Recommended QuantitySpecifications   Nip 1-1, 1-2, 2-6, 2-8, 3-1, 4-1, 4-4, 4-5Index