Toshiba G9000 operation manual Startup guidance

Page 39

FIGURE 2.3.1 Startup/Shutdown Guidance

FIGURE 2.3.2 Startup guidance

FIGURE 2.3.3 Shutdown guidance

Follow Startup/Shutdown guidance accordingly.

B)MEASUREMENT MENU (FIGURES 2.4.1 to 2.4.3)

This screen shows details of measured values. Input and Output values are displayed. During Battery operation, Remaining battery power and Run time are also displayed.

FIGURE 2.4.1 Input values

G9000 Installation and Operation Manual

29

Image 39
Contents Document 4GBA0012 Rev. E January Page Document No GBA0012 Rev. E January Page Important Notice Uninterruptible Power SystemPurpose and Scope of Manual Table of Contents List of Tables List of Figures Power wire connections parallel system configuration How to use this Manual Important Safety Instructions Safety Precautions Environment standard UPS Installation EnvironmentCapacity kVA Bypass Voltage Vac Bypass Rating Aac Breaker a General Definitions Operation Overview CB3 Mccb Single Line Diagram Battery Operation Page 1 UPS Parts Location 80,100kVA UPS cabinet Front View UPS Parts Location 300kVA Door Backside Main CabinetUPS cabinet Front Inside View Backside of Left Door 4 UPS Parts Location 500kVA UPS cabinet Front ViewItem 10 Grounding bar is not shown in .4.5. Refer to Figure 12. SW5 13. SW6 Reset switch Button Test switchCN96 CN95 CN94 1 Parallel I/F PCB IFAU-08 80-225kVAExternal I/F PCB IOAU-09 Figure Signal I/F on IOAU-09 board Description of Figures 1.4.1-5 toLCD Touch Panel Monitor Display AC input, AC output, DC input terminal 15 L S/W switch for Service Personnel onlyExternal contact signal terminal block Refer to Figures 3.7.1 to 3.7.4 for details80kVA / 72kW 480V SpecificationsLbs Heating KVA Knockout KBTU/h Width Depth Height Net Weight TypicalWidth Depth Height Gross Weight Lbs KVA UPSAC Input A Detail of SpecificationsCooling Operating TemperaturePhase I 80-225kVA Phase II 300-750kVA Output Capacity of Equipment Number Application Rating of Contactors, Breakers and Fuses Operator Controls and Indicators Load on inverter Load on Inverter green Battery operation Battery OP. orangeEPO Button Emergency Power Off button LED DisplayLiquid Crystal Display MenuStartup/Shutdown Guidance Figures 2.3.1 to 2 Startup guidance 2 Output values 1 Log menu Fault Indication Input Power FailureMessage TN2 External Signal Terminal BlockSummary Alarm Triggers on fault alarm only OUT8 Total Alarm Triggers on any alarm including faultsTN1 Battery Breaker PanelTerminals 3 to 4 Load on Bypass contact OUT1 Output Contacts for external alarm annunciationTerminals 7 to 8 Battery Operation contact OUT3 Terminals 11 to 12 Battery Low Voltage contact OUT512 Remote Start Contact Connections Input Contacts for remote access of UPSTerminals 9 to 10 Remote Inverter Stop input terminal IN2 Terminals 11 to 12 Battery Temp. High contact input IN3Terminals 13 to 14 Power Demand Command contact input IN4 Used to perform a remote UPS Emergency Power Off EPORemotEyeII Introduction 13.1 Configuration of the RemotEyeII Overview 80-225kVAPSAU-60 Back of the front door Main cabinet RemotEyeIIDPAU-81 SW1 Cable2 Cable3 ProvidedBack of the front left door Main cabinet Provided PSAU-60 PS1 Cable1SW1 Cable1 3BBA0083P001 Male Cable3 12V Power Cable Cable2 Sub 9-pin Cable15 PSAU-60 PCB PS1 Connector Definition Figure Space requirement for routine maintenance Transportation and InstallationTransportation Installation Installation ProcedureKVA Rating Current Permitted a External Battery SupplyProcedure for Cable Connections UPS Capacity DC VoltageRequired Page Recommended Cable Sizes UPS Terminal Designation Crimp Type Compression LugLocation of bus bars and terminal blocks Bottom Entry UPS moduleInput A40,B40,C40 UPS module 300kVA Detailed Power TerminalsUPS module 500kVA A50, B50, C50 Grounding Bar not shown 18.5UPS module 750kVA AC Output 78.7 A50, B50, C50 Grounding Bar Not shown 19.7BUS BAR Detail TOP View BUS BAR Detail TOP View BUS BAR Connection TOP View Alternate Landing Main Cabinet BUS BAR Connection DC Breaker for Battery CB2 Battery Bypass52S Converter CB1 /Charger Inverter 52CBreaker 52Ln *1 AC output UPS-1 UPS-1 ~~~~~ UPS-1 No.N UPS Use Ethernet STP Shielded Twisted Pair Cable Cat 5 or ~~~~~ Circuit protectors location Operating ProceduresOperation Menu Shut-down ProcedureUPS Bypass Operation ProcedureLCD Screen MMS Operation MMS Start-up ProcedureResponse to UPS Failure Battery Replace battery if its capacity is within this percentageUPS Component Parts Fault Codes Failure Code List Fault Code CB2 Open DC Unbalanced Overvoltage Engineer Inverter Call Service 52S Abnormal Daily Inspection How to perform daily inspectionPage Consult latest edition of applicable National and local codes for possibleVariations 94 @ 0.9 PF 235 250 AT Kcmil 300 kcmil 27.6 x 32.8 x 855 136 13,463114 150 AT 3/0 100 120 150 AT 3/0149 @ 0.9 PF 372 400 AT Kcmil 35.4 x 32.8 x 1160 144 17,821151 181 250 AT Kcmil 300 kcmil 160 192 250 AT Kcmil 300 kcmil210 @ 0.9 PF 524 600 AT 300 kcmil 2 x 400 kcmil 35.4 x 32.8 x 1230 152 25,060212 255 350 AT Kcmil 2 x 250 kcmil 225 271 350 AT Kcmil 2 x 250 kcmil309 @ 1.0 PF 772 800 AT 400 kcmil 51.2 x 32.7 x 1230 189 31,659312 376 500 AT 250 kcmil 2 x 300 kcmil 300 361 500 AT 4/0 2 x 250 kcmil512 @ 1.0 PF 1292 1400 AT 400 kcmil 4 x 500 kcmil 70.9 x 32.7 x 3300 205 52.8 23.6 42.3521 626 800 AT 300 kcmil 3 x 350 kcmil 500 601 800 AT 300 kcmil 3 x 350 kcmil776 @ 1.0 PF 1935 2000 AT 400 kcmil 6 x 500 kcmil 90.6 x 32.7 x 4255 207 79,147781 939 1400 a 500 kcmil 750 902 1200 a X350 kcmil 4 x 400 kcmilPage Page Industrial Division
Related manuals