Toshiba 1000 user manual System Configuration

Page 30

2.6System Configuration

The UPS device and the internal backup battery make up the system. Depending on the site and load requirements of the installation, available options may be utilized to create a tailored solution.

Planning a UPS system should include the following considerations:

The total demand of the protected system shall dictate the output power rating (VA). Allow a margin for future expansion or calculation inaccuracies from measuring power requirements.

Backup time required will determine the battery size needed. If the load is less than

the UPS nominal power rating then the actual backup time will be longer. Here are the following backup time for each model that is based in a 100% load.

Model

Backup time Internal

Recharge time to 90%

batteries

capacity

 

UPS 1000VA

7 min

4 hours

UPS 1500VA

6 min

4 hours

UPS 2000VA

6 min

4 hours

UPS 2400VA

11 min

4 hours

UPS 3000VA

5 min

4 hours

UPS 6000VA

7 min

4 hours

The following configuration options are available for enhanced UPS performance:

External Battery Cabinets. (Additional External Battery Cabinets are available if more back-up time is needed.)

Connectivity options (Remote Contact, SNMP/WEB card).

5

Image 30
Contents 1000 &1000+ Series Important Notice Uninterruptible Power System Table of Contents Limitations and Exclusions Manual’s Purpose and Scope Page VII EMC Statements FCC PartICES-003 Declaration of Conformity Request General Safety Instructions Safety Alert Symbol / Signal WordsPage Special Symbols Important Safety Instructions Qualified Personnel only Qualified Personnel shallPage XVI Instructions Importantes Concernant LA Sécurité Conserver CES InstructionsInspection/Storage/Disposal Storage Maintenance DisposalInstallation Precautions Conductor Routing and Grounding Operating Precautions Maintenance Note Xxiv Introduction System DescriptionGeneral Description Efficiency Optimizer Function Free Run Mode Diagnostic TestsAuto-Restart System Configuration Storage ShippingPage Installation EnvironmentUPS Frequency Converter Option Rear Panel Views 1000VA 1500VA Tower Rear Panel 2000VA 3000VA Tower Rear Panel2400VA Tower Rear Panel 2400VA Power Wiring Options X1-N or N-X3 120V Half Load1000 1500 VA Rack mount 2U Rear Panel 2000 3000 VA Rack mount 2U Rear PanelVA Rack mount UPS 3U, Battery Pack 3U Rear Panel Example of Installation of Plug & Play products 2400 VA6000 VA Front Panel Settings HE Mode SET ON/OFFOutlet GROUP1/GROUP2 Computer and Alarm Connections RS-232 Standard Interface PortDB9 Male Connector Outline Facing connector Dry Contact Interface optional cardNetwork Transient Protector EPO Port emergency power offUSB Port Load SegmentsShutting Down the UPS User’s Guide to OperationsUPS Startup and Shutdown Starting the UPS Button OperationControl Panel Functions Control panels 1000/1500/2000/3000VA Normal DisplayUPS Configurations UPS Meters DisplayLCD Message Description Page UPS Manual Test Audible AlarmsSilencing an Alarm Interpreting UPS MessagesTroubleshooting Alarm Description What You Should DoMaintenance Battery ServicingTechnical Specifications Power Range 1000-3000 VA 120Power Range 2400 VA 208/240 Power Range 6000 VA 208/240 Rackmount US 208/240V UT1G1G060C6RKB3 + UT1-BR-0607 GeneralEnvironment Power Range 1000-3000 VA 230 RKB2Backup Time at Partial Loads Warranty Information Uninterruptible Power SystemLimitations and Exclusions Modifications
Related manuals
Manual 54 pages 29.07 Kb Manual 2 pages 33.02 Kb