Mitsubishi Electronics RV-6S Confirming the operation, + J4 axis, J5 axis, J1 axis

Page 28

2Unpacking to Installation

2.4 Confirming the operation

In this section, the robot will be moved manually using the T/B to confirm that the operation is correct.

Moving the robot manually is called "jog operation". This operation includes the JOINT jog that moves each axis, the XYZ jog that moves along the base coordinate system, the TOOL jog that moves along the tool coordinate system, and the CYLNDER jog that moves along the circular arc.

This operation is carried out while pressing the deadman switch on the back of the T/B.

CAUTION The robot will move during this operation. Make sure that there are no operators near the robot, and that there are no obstacles, such as tools, in the robot operation range.

CAUTION To immediately stop the robot, release the deadman switch on the back of the T/B. The servo power will turn OFF, and the robot will stop.

The robot will also stop if the [EMG.STOP] switch (emergency stop switch) on the front of the T/B or the [EMG.STOP] switch (emergency stop) on the front of the controller is pressed.

WARNING Confirm that the origin has been set. If the origin has not been set, "****" will appear at the current position display on the teaching pendant, the JOINT jog oper- ation will take place in any jog mode selected.

Refer to "2.3 Setting the origin" on page 12 for details on setting the origin.

 

 

+ J4 axis

 

 

 

 

J3 axis

 

J5 axis

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

J6 axis -

 

 

 

 

 

 

 

 

J2 axis

 

 

 

 

 

 

 

 

 

J1 axis

 

 

 

 

 

 

 

* Each axis moves independently.

Fig.2-10 : JOINT jog operation

2-18Confirming the operation

Image 28 Contents
Mitsubishi Supplemental Instruction Change of the lubrication method and notes Robot front Safety Precautions Page Revision history Page Contents Appendix-66 Before starting use Symbol Meaning Safety Precautions 4Safety Precautions Unpacking to Installation Confirming the product Part name Type Qty RemarksInstallation UnpackingTransportation procedures Transporting with a crane Installation procedures Grounding procedures Grounding methods Grounding proceduresConnecting with the controller CN2 CN1Hook Projection Setting the origin Installing the teaching pendant T/BInstalling with the control power OFF Remove T/B switchTurning on the control power Preparing the T/B When T/B operations are mistaken Operating from the T/B Selecting the origin setting method Selecting a menuInputting the origin data Changes to OriginInstalling the shoulder coverB Moving the cursorInputting characters Correcting an inputConfirming the operation + J4 axisJ5 axis J1 axis- + Control point +X+Y Control point+ J4 J6 - Control point +X+Y Radius Arc Control point +X+YWhen the robot is in the transportation posture Joint jog operation- + J1 axis J2 axisWhen an XX appears on the T/B screen display J3 axisJ6 axis + J4 axisXYZ jog operation When alarm No occurs Tool lengthTool jog operation 26Confirming the operation Jog mode will change when only XYZ key is pressed again Axis XYZ jog operation28Confirming the operation Cylnder jog operation Arc- + +X -View B View C Section aNo.2 arm View from No arm cover B side No.2 arm Port Installing the hand input cable View DInstalling the hand output cable Changing the operating range Axis Standard Alternative angle3Installing the option devices Basic operations Maintenance and Inspection Maintenance and inspection intervalInspection items Daily inspection itemsBattery on Periodic inspectionMaintenance and inspection procedures Robot arm structureMaintenance and inspection procedures Installing/removing the cover : Installing/removing the cover: Cover names Inspection, maintenance and replacement of timing belt Timing belt replacement periodMark M4×12(Socket bolt) 5Timing pulley 4Timing pulley Timing belt tension : SlackLubrication Lubrication position and specifications View from a: Lubrication specifications Lubrication methodReplacing the backup battery Replacing the robot arm batteryMaintenance parts Part name Type Usage place Qty SupplierResetting the origin Method Explanation RemarksJig method Diagram of the robot viewed from the top Origin setting axis designation56Resetting the origin J3 axis origin setting 58Resetting the origin J5 axis origin setting 60Resetting the origin User origin method 62Resetting the origin View a ABS origin methodJ4 axis J3 axis J6 axis J5 axis J1 axis J2 axis ABS mark64Resetting the origin Recording the origin data Appendix Appendix 1 : Configuration flag RIGHT/LEFTConfiguration flag Appendix-67 Specifications are subject to change without notice