Mitsubishi Electronics RV-6S instruction manual No.2 arm View from No arm cover B side

Page 42

3Installing the option devices

Fig. 3-1and Fig. 3-2shows the solenoid valve installation procedures and the solenoid valve connector connection procedures. The installation procedures are as follow. This work must be carried out with the controller power turned OFF.

1)Remove the hexagon socket bolts (five M4 x 10) and truss screw (three M3 x 8) that hold the No. 2 arm cover B <2>, and then remove both the No. 2 arm cover B <2>.

2)Remove the socket bolts <4> (four M4 x 8) that hold the No. 2 arm cover C <3>, and then remove both the No. 2 arm cover C <3>.

3)If you are not using the spare line (ADD: stored in a coil) in section A shown in Fig. 3-1, remove it. The spare line is connected to a connector inside section A.

Solenoid valve

Connector storage position

Cut to an appropriate length

 

No.2 arm

View from No. 2 arm cover B side

Fig.3-2 : Solenoid valve installation diagram details 1

4)The length of the two air hoses (φ6) stored in section A is longer than necessary by assuming the use of a solenoid valve set not manufactured by Mitsubishi. Cut off the air hoses to an appropriate length, and connect them to the couplings.

5)Of the two air hoses (φ6), the one marked with "AIR IN" is for connecting the quick coupling (P port) <6> of the solenoid valves, and the other marked with "RETURN" is for connecting the quick coupling (R port) <7> of the solenoid valves.

6)Using the screw holes of the No. 2 arm cover C <3>, mount the solenoid valves with the socket bolts (four M4 x 8) attached to the solenoid valves. When mounting the solenoid valves, be careful not to damage the sponge sealing material attached to the opening of section A. If the sealing material is damaged, it may degrade the protection specification.

7)Connect the connectors of GR1 to GR2 stored in section A to the plugs of GR1 to GR2 coming out of the solenoid valves. Store the connectors near the location marked with ○ shown in Fig. 3-2. Fig. 3-2shows a view when stored.

3-32Installing the solenoid valve set (1S-VD01-02/VD02-02/VD03-02/VD04-02)

Image 42 Contents
Mitsubishi Supplemental Instruction Change of the lubrication method and notes Robot front Safety Precautions Page Revision history Page Contents Appendix-66 Before starting use Symbol Meaning Safety Precautions 4Safety Precautions Unpacking to Installation Confirming the product Part name Type Qty RemarksInstallation UnpackingTransportation procedures Transporting with a crane Installation procedures Grounding procedures Grounding methods Grounding proceduresConnecting with the controller CN2 CN1Hook Projection Installing with the control power OFF Setting the originInstalling the teaching pendant T/B Remove T/B switchTurning on the control power When T/B operations are mistaken Preparing the T/BOperating from the T/B Selecting the origin setting method Selecting a menuInputting the origin data Changes to OriginInputting characters Installing the shoulder coverBMoving the cursor Correcting an inputJ5 axis Confirming the operation+ J4 axis J1 axis- + Control point +X+Y Control point+ J4 J6 - Control point +X+Y Radius Arc Control point +X+Y- + J1 axis When the robot is in the transportation postureJoint jog operation J2 axisJ6 axis + When an XX appears on the T/B screen displayJ3 axis J4 axisXYZ jog operation When alarm No occurs Tool lengthTool jog operation 26Confirming the operation Jog mode will change when only XYZ key is pressed again Axis XYZ jog operation 28Confirming the operation Cylnder jog operation Arc- + +X -View B View C Section aNo.2 arm View from No arm cover B side No.2 arm Port Installing the hand input cable View DInstalling the hand output cable Changing the operating range Axis Standard Alternative angle3Installing the option devices Basic operations Maintenance and Inspection Maintenance and inspection intervalInspection items Daily inspection itemsBattery on Periodic inspectionMaintenance and inspection procedures Robot arm structureMaintenance and inspection procedures Installing/removing the cover : Installing/removing the cover: Cover names Inspection, maintenance and replacement of timing belt Timing belt replacement periodMark M4×12(Socket bolt) 5Timing pulley 4Timing pulley Timing belt tension : SlackLubrication Lubrication position and specifications View from a: Lubrication specifications Lubrication methodReplacing the backup battery Replacing the robot arm batteryMaintenance parts Part name Type Usage place Qty SupplierResetting the origin Method Explanation RemarksJig method Diagram of the robot viewed from the top Origin setting axis designation56Resetting the origin J3 axis origin setting 58Resetting the origin J5 axis origin setting 60Resetting the origin User origin method 62Resetting the origin J4 axis J3 axis View aABS origin method J6 axis J5 axis J1 axis J2 axis ABS mark64Resetting the origin Recording the origin data Appendix Appendix 1 : Configuration flag RIGHT/LEFTConfiguration flag Appendix-67 Specifications are subject to change without notice