Viking Access Systems f1 gate manual Electrical Installation, High Voltage Supply Option

Page 20

ELECTRICAL INSTALLATION

High Voltage Supply Option

!Caution: Always turn off power breakers when working with high voltage. DO NOT connect the “Power Harness” to the Control Board until the electrical installation is complete and ready for verification.

STEP 1

At the “Power Box”:

a. Set the “Voltage Selector” according

1a

to the supply voltage (115V or 230V).

 

b. Turn the “AC Power” switch ON

STEP 2

!WARNING: SINGLE PHASE AC ONLY

At the “J-Box”:

a. Connect the incoming power wires,

matching the wire color codes.2a b. If the supply voltage is 120VAC,

connect the red wire, labeled “Outlet Power”, to the neutral (white) wires.

STEP 3

a.Turn ON the main facility breaker

b.Verify that all three (3) LEDs are illuminated at the “Power Box”.

c.Turn the “Battery Switch” ON.

At the Control Board:

3d

d. Connect the Power Harness and verify the “POWER” LED is illuminated solid.

!TECHNICAL TIP: If the “Power” LED is flashing or any of the 3 LEDs on the “Power Box” are not illuminated, refer to the Troubleshooting pages.

Tips for proper ground installation:

To minimize the effects caused by lightning, follow these guidelines.

Use a ground rod to provide a ground reference.

Consult your city code and be aware of under-ground services in the site of the gate operator to prevent inconveniences.

Always use a single bonding point for grounding.

All ground wires must be as short and as thick as possible.

Prevent unnecessary turns or loops in all ground wires.

1 8

1b

3c

3b

Earth Ground

Ground Rod

VIKING TECHNICAL SUPPORT 1.800.908.0884

Image 20
Contents Instructions Viking F-1 Swing Gate Operator Vehicular Gate Operator Revision F1NXMN10.D October Parts Diagram DescriptionOperator References Limit Setup Buttons Control Board ReferencesTable of Contents Important Installation Instructions Important Safety InformationImportant Safety Instructions Important Installation Instructions Maintenance General Safety PrecautionsGlossary Install the gate operator only whenUL325 Gate Operator Classifications Photo Beam non-contact sensor Installation Secondary Entrapment ProtectionEdge Sensor contact sensor Installation When manual operation is requiredManual Release To resume normal operationAudible Alarm Reset Switch Installation Manual Reset for the Audible AlarmSpecifications Single Phase 50Hz / 60HzAlternative Power 24VAC / VDC 60VA or Solar Locate Control ButtonsGate Operator Installation Concrete Pad Option Post Mounting Option Required ADD-ON PART# VA-F1PSOperator Positioning Technical Tips Operator and Arm GeometryStep High Voltage Supply Option Electrical InstallationTips for proper ground installation Low Voltage Supply Option Solar Supply Option1a 1b Limits SetupAt the Limit Cam & Holder assembly Limits Setup Cable Requirements MASTER/SLAVE SetupTwo Wire Communication Wireless Communication Options Required ADD-ON Choose option a or BInitial Settings Timer Hold Open TimerODS Obstruction Detection SensorControl Board Setup Auto Open Power Failure OptionLast Open Power Failure Option Fail Safe ModeWhen the Obstruction Sensor detects an obstruction it will Obstruction Sensor Primary Entrapment ProtectionODS Obstruction Detection Sensor Flashing OverloadViking Lock Mode Use the LCD Display to activate this featureViking Heater To set the heater to turn on at the Close LimitThis page Left Blank Intentionally Accessory Connections Re-Open Photo Beam vehicular SafetyCOM + Check for proper operationOpen Only Radio Receiver TypicalOpen-Stop-Close Anti-Tailgate, Open Commands & Guard Station Open CommandsGuard Station ATG Anti-TailgateViking Loop Rack Accessory Connections Guidelines for Loop InstallationMagnetic Lock Lock Solenoid Power for the LocksMagnetic Lock, Lock Solenoid Synchronization with B-12 Barrier Arm B-12 Synchronization OptionTroubleshooting LED ReferencesTroubleshooting LCD MSG Meaning LCD Display ReferencesTroubleshooting Error Messages Solutions CheckAccess Control Connections Power ConnectionsAppendix a Relays In GeneralGeneral Technical TIP Viking usesCommon Radio Receivers Connections Appendix C Solar ApplicationsPanels Batteries & FuseViking Konnect Master/Slave Kit Secure and reliable Viking Konnect Diagnostic Tool On-site remoteViking Expansion Products OUR Continuous Commitment to Excellence Standard Features