GTO GP-SW050 owner manual Maintenance Schedule

Page 32

Maintenance

WARNING: ALWAYS TURN OPERATOR OFF AND DISCONNECT

AC POWER BEFORE ADJUSTING OR SERVICING IT.

Maintenance Schedule:

Test the operator, accessories, and safety devices monthly.

Service the gate operator, accessories, and safety devices regularly.

Maintenance Checklist

Test the safety edges to make sure the gate responds.

Check the obstruction settings (both open and close modes) see page 18.

Check for wear on all moving parts, and tighten bolts as necessary.

Check the gearbox for any sign of oil leakage. If the gearbox is leaking, call the GTO Service Department for assistance.

Check hinges on the gate and lubricate if needed.

Check for loose or corroded wires.

Make sure the warning signs (see page 5) are installed.

29

Image 32
Contents GP-SW050 Conversion Chart Vehicular gate operator class categoriesTable of Contents Important Safety Instructions for the System Designer Before Installation III. After InstallationMeans of Protection Against Entrapment Important Safety Instructions for the Consumer/End User Required Safety Precautions for Gates Entrapment ProtectionMoving Gate Can Cause Injury Or Death Technical Specifications MotorParts Identification Operator ChassisInstalling the Gate Operator Preparation of the GateUsing the Mounting Template Before mounting the operator, check the followingTemplateMounting Removing the Operator Housing Mounting the OperatorConnecting Power to the Operator Not providedGate Arm Connection Overview Right Mounted ArmConnecting the Gate Arm to the Gate Install the key into the output shaft. FigControl Board Description ExitSetting the Limits Open Limit SettingStall Force and Auto-Close Adjustments Stall Force AdjustmentDIP Switch Settings DIP #1 Open DirectionInput Connections Siren-Activated Entry Device Accessory Terminal ConnectionsGTO Loop Detector Button Station Output Connections Lock COM and Lock N.O. / Lock N.C. Lock relay outputAccessory Power Supply Connection 12Vdc @ 300 mA Power SupplyWiring a 3-button station Prison Mode Operation Class IV ApplicationsReinstalling the Operator Housing Installing a Dual Gate Operator System Dual Gate Link ConnectionSetting Dual Gate Sequence Slave DIP Switch SettingsOverview of a Dual Gate Operator Installation Slave OperatorMaintenance Maintenance ScheduleTroubleShooting Guide GP-SW050 Audible FeedbackSafety LED on Cycle LED on brightlyShadow LED on Open Edge LED onClose Edge LED on Open LED on brightlyClose LED on brightly Stop LED on brightlyWarranty and Repair Service Instructions for the Consumer/End UserW . g t o a c c e s s . c o m Installation ChecklistInstallation of this operator conforms to Class