23. Remove the upper 3/8” x 3” Bolt (45) from the | 23 |
|
|
|
|
|
Top Frame (1) and the Main Upright (3). |
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
| 35 | 55 | 54 |
Route the High Cable (73) around a 4” Pulley |
|
| Slot | 45 | ||
(35) and down through the indicated slot in the |
|
|
|
|
|
|
Main Upright (3), as shown. Attach the Pulley |
| 50 |
|
| 42 |
|
inside the slot with a 3/8” x 2 1/2” Bolt (54), two |
|
|
| 73 | ||
|
|
|
|
| ||
3/8” Washers (55), two 5/8” x 1/2” Bushings (42), |
|
|
|
|
| |
| 1 |
|
|
|
| |
and a 3/8” Nylon Jamnut (63). |
|
|
|
|
| |
|
|
|
|
|
| |
|
|
| 42 |
|
| |
a 3/8” Nylon Locknut (50). Note: The High Cable |
| 63 | 55 |
|
| |
(73) must be seated in the groove of the 4” |
|
|
|
|
|
|
Pulley (35) before the Bolt is inserted. |
|
|
|
|
|
|
|
|
|
| 3 |
|
|
24. Route the High Cable (73) under the welded tube | 24 | Welded Tube |
|
| ||
on the Press Frame (12) and around a 4” Pulley |
|
| ||||
|
| 59 | ||||
(35) as shown. Attach the Pulley to the Press |
|
|
|
|
| |
|
|
|
|
|
| |
Frame with a 3/8” x 8 1/2” Bolt (59) and a 3/8” |
|
|
|
|
|
|
Nylon Locknut (50). |
|
|
|
|
|
|
|
| 50 |
|
| 35 |
|
|
|
|
|
|
| |
|
|
|
|
| 73 |
|
|
|
|
| 12 |
|
|
25. Wrap the High Cable (73) around a 4” Pulley (35). | 25 |
|
|
|
|
|
Attach the Pulley inside the indicated slot in the |
|
|
|
|
| |
|
|
|
|
|
| |
Main Upright (3) with a 3/8” x 2 1/2” Bolt (54), two |
|
|
|
| 54 |
|
3/8” Washers (55), two 5/8” x 1/2” Bushings (42), |
|
|
|
|
| |
|
|
| 42 |
|
| |
and a 3/8” Nylon Jamnut (63). |
|
|
|
|
| |
|
|
|
|
|
| |
Wrap the High Cable (73) around another 4” Pulley |
|
|
|
| 55 |
|
|
|
|
|
|
| |
(35) in the direction shown. Route the High Cable | 35 |
|
|
|
| |
through the slot in the Main Upright (3). Attach the |
|
|
|
| ||
|
|
|
|
|
| |
Pulley to the Press Frame (12) with a 3/8” x 8 1/2” | 42 |
|
|
|
| 59 |
Bolt (59) and a 3/8” Nylon Locknut (50). |
|
|
|
|
| |
|
|
|
|
|
| |
| 63 | 55 |
|
|
|
|
|
| Slot |
| 73 |
|
|
|
| 50 |
|
|
| |
|
|
| 12 | 35 |
| |
|
|
|
|
| ||
|
|
|
| 3 |
|
|
| 13 |
|
|
|
|
|