33. Attach a 4” Pulley (35) over the Low Cable (72), | 33 |
|
|
|
inside the front leg of the Base (8) with a 3/8” x |
|
|
| |
|
|
|
| |
2 1/2” Bolt (54), two 3/8” Washers (55), two 5/8” x |
|
|
|
|
1/2” Bushings (42), and a 3/8” Nylon Jamnut (63). |
| 8 |
|
|
|
|
|
| |
| 72 | 35 |
| 55 |
|
|
|
| |
|
|
|
| 54 |
|
|
|
| 42 |
| 63 |
|
|
|
| 55 | 42 |
| |
|
|
| ||
34. Route the Low Cable (72) through the indicated | 34 |
|
|
|
slot in the Main Upright (3) and the Base (8). |
|
|
| |
| 35 | 62 |
| |
|
|
| ||
Wrap the Low Cable (72) around a 4” Pulley (35) |
|
|
|
|
in the direction shown. Attach the Pulley inside | 50 |
|
|
|
the bracket on the Main Upright (3) with a 3/8” x |
|
|
| |
|
|
|
| |
2” Bolt (62) and a 3/8” Nylon Locknut (50). |
|
| 72 | 3 |
|
|
| ||
| Bracket |
| Slot | |
|
|
| ||
|
|
|
| 8 |
35. Wrap the Low Cable (72) over a 4” Pulley (35). | 35 |
|
|
|
Slide the Pulley and a Cable Trap (44) between the |
|
|
| |
|
|
|
| |
two Pulley Plates (31). Make sure the Cable is in |
|
|
|
|
the groove of the Pulley and that the Cable Trap | 31 |
| 60 |
|
is oriented so it will hold the Cable in place. |
|
| ||
|
|
|
| |
Attach the 4” Pulley (35) and the Cable Trap (44) |
|
| 44 |
|
to the third set of holes from the bottom of the | 63 |
|
|
|
Pulley Plates (31) with a 3/8” x 1 3/4” Bolt (60) |
|
|
| |
35 |
|
|
| |
and a 3/8” Nylon Jamnut (63). |
|
|
| |
| 72 |
|
|
|
36. Wrap the Low Cable (72) around a 4” Pulley (35). | 36 |
|
|
|
Attach the Pulley inside the bracket on the Main |
|
|
| |
|
|
|
| |
Upright (3) with a 3/8” x 2” Bolt (62) and a 3/8” |
|
| 72 |
|
Nylon Locknut (50). |
|
| 35 | 62 |
|
|
| ||
|
|
|
| 3 |
|
| 50 |
|
|
| 16 |
|
|
|