| 79 |
| 48 |
| 93 |
| 36 3/8 X |
FIGURE 34 | 5 |
|
STEP 34
•Assemble one
21 |
|
93 | 24 |
| FIGURE 35 |
STEP 35
•Slide the ends of the PEC DEC CABLE (93) into the bushings on the PEC CAMS (24) as shown on FIGURE 35.
•Lay the PEC DEC CABLE (93) over the pulleys and under the cable retaining clips in the CENTER PULLEY BRACKET (21) as shown in FIGURE 35. (NOTE: The bolt holding pulley and cable retaining clips may need to be loosened to align cable retaining clips with cable.)
24