ParaBody 400102 manual 36 3/8 X 1-3/4

Page 24

 

79

 

48

 

93

 

36 3/8 X 1-3/4”

FIGURE 34

5

 

STEP 34

Assemble one 3-1/2” PULLEY (79) around the PEC DEC CABLE (93) and to the PULLEY BRACKET (5) using one 3/8 X 1-3/4” BOLT (36) and one 3/8” LOCKNUT (48) as shown in FIGURE 34.

21

 

93

24

 

FIGURE 35

STEP 35

Slide the ends of the PEC DEC CABLE (93) into the bushings on the PEC CAMS (24) as shown on FIGURE 35.

Lay the PEC DEC CABLE (93) over the pulleys and under the cable retaining clips in the CENTER PULLEY BRACKET (21) as shown in FIGURE 35. (NOTE: The bolt holding pulley and cable retaining clips may need to be loosened to align cable retaining clips with cable.)

24

Image 24
Contents Home GYM Bolt Length Ruler Parts List KEY Description QTYStep 50 1/2 LOW Height X 3-3/4 42 1/2 X X 3-3/4 42 1/2 X LOW Height TAB Ways Allow Spring PIN Assembly to Fully Engage Step DetailLocknuts 38 3/8 X 2-3/4 Silicon or teflon spray available at most hard Ware stores Tighten 37 3/8 X Roller PAD 32 with rubbing alcohol or water. Also X 3 47 1/2 X 5-1/2 42 1/2 X 50 1/2 LOW HT NUT 48. Note Make sure LEG EXT Lowheight LOCKNUT50.NOTEAssemble one 3-1/2 Pulley 79 to the Floating Pulley Cable Guide Step Step Step 36 3/8 X 1-3/4 See Detail Cableadjustment Adjustment Adjustment Lowerfloating PulleybracketUpperfloatingpulleybracket Step