| STEP 20 |
|
|
| 71 |
|
| • Assemble two 3/4” THRUST WASHERS (68) and two PEC | ||
|
|
|
| |||
|
| 19 |
| CAMS (24) to the LEFT (20) & RIGHT (19) PEC ARMS, as | ||
|
|
| shown on FIGURE 20. |
| ||
|
|
|
|
| ||
|
|
|
| • Insert four 3/4” FLANGE BEARINGS (69) into the bushings | ||
|
|
|
| of the BEARING HOUSING (17). |
| |
20 |
| 68 |
|
|
|
|
|
|
|
|
|
| |
|
|
|
| • Insert the LEFT (20) & RIGHT (19) PEC ARMS through the | ||
|
|
|
| 3/4” FLANGE BEARINGS (69) in the BEARING HOUSING | ||
|
|
|
| (17) on their respective side as shown, and secure them in place | ||
|
|
|
| with two 3/4” STARLOCK COLLARS (73). | ||
|
|
| 32 |
|
|
|
|
|
|
| • Slide two PEC DEC ROLLER PADS (32) onto the LEFT (20) | ||
|
|
|
| & RIGHT (19) PEC ARMS until the ROLLER PAD (32) is | ||
|
|
|
| flush with the bottom of the pec arms. | ||
|
| 69 |
|
|
|
|
|
|
|
| • (NOTE: If a lubricant is required coat the inside of the | ||
| 24 |
|
| ROLLER PAD (32) with rubbing alcohol or water. Also, | ||
|
|
|
| rotating the pad while pushing up will help ease assembly.) | ||
|
|
|
| • Securely assemble two 3/8” SPRING PIN ASSEMBLIES (71) | ||
|
|
|
| to the spring pin barrels of the PEC ARMS (19 & 20). | ||
| 17 |
|
|
|
|
|
| 69 |
|
|
|
|
|
| 73 |
|
|
|
|
|
FIGURE 20 |
|
|
|
|
|
|
1/2 | 1/2 | 1/2 | 3 | 1/2 | 1/2 | 1/2 |
0 | 1 | 2 | 4 | 5 | 6 | |
|
|
| 15 |
|
|
|