ParaBody 400102 manual Cableadjustment

Page 26

93

5

91

FIGURE

38

FIGURE 39

92

81

74

57

12

26

STEP 38

Screw the threaded end of AB CABLE (91) ap- proximately 3/4” into the end of the PULLEY BRACKET (5) and tighten jam nut securely as shown in FIGURE 38.

IMPORTANT! Make sure the cables are running in the grooves of all pulleys.

CABLEADJUSTMENT

For maximum performance, the HEAD PLATE should should just barely sit on the top WEIGHT PLATE and the UPPER FLOATING PULLEY BRACKET should firmly contact the PLATE on the TOPBOOM, and the LOWER FLOATING PULLEY BRACKET should firmly contact the BASE.

The following adjustments can be made to adjust the cable tension:

If upon completion of assembly, the HEAD PLATE (81) does not sit on top of the first WEIGHT PLATE (74), push the HEAD PLATE (81) down, insert the WEIGHT STACK PIN (57) and perform several repetitions at the press sta- tion. This will relax the cable system and prevent the HEAD PLATE (81) from lifting up.

If after completing previous step, the HEAD PLATE (81) still does not sit on top of the first WEIGHT PLATE (74) or if there is excess slack in the cable system, adjust the threaded end of the LAT CABLE (92) accordingly and retighten the jam nut.

If there is excess slack in the LEG CABLE, move the PULLEY attached to the LEVER STOP (12) down one hole.

If there is excess slack in the AB or PEC DEC cable system, adjust the threaded end of the AB CABLE (91) accordingly and retighten the jam nut.

IMPORTANT! Retighten both jam nuts when adjustment is completed.

Image 26
Contents Home GYM Bolt Length Ruler Parts List KEY Description QTYStep 50 1/2 LOW Height X 3-3/4 42 1/2 X X 3-3/4 42 1/2 X LOW Height TAB Ways Allow Spring PIN Assembly to Fully Engage Step DetailLocknuts 38 3/8 X 2-3/4 Silicon or teflon spray available at most hard Ware stores Tighten 37 3/8 X Roller PAD 32 with rubbing alcohol or water. Also X 3 47 1/2 X 5-1/2 42 1/2 X 50 1/2 LOW HT NUT 48. Note Make sure LEG EXT Lowheight LOCKNUT50.NOTEAssemble one 3-1/2 Pulley 79 to the Floating Pulley Cable Guide Step Step Step 36 3/8 X 1-3/4 See Detail Cableadjustment Upperfloatingpulleybracket AdjustmentAdjustment Lowerfloating Pulleybracket Step