ParaBody 400102 manual Detail, Ways Allow Spring PIN Assembly to Fully Engage Step

Page 9

DETAIL 9

PUSH/PULL

 

CABLE

 

 

 

8

 

 

 

 

13

 

1/4” NUTS

 

 

DO NOT OVERTIGHTEN!

 

13

SPRING PIN

 

 

 

FIGURE 9

ASSEMBLY

DETAIL 9

 

STEP 9

 

 

Assemble the PUSH/PULL CABLE from the PRESS ARM (8) to the SPRING PIN HOUSING and to the L-BRACKET on the RECEIVING TUBE (13) as shown on FIGURE 9 and DETAIL 9 using the following steps:

· Thread the first 1/4-28 IN. NUT to the bottom of the threaded end of the CABLE. Allow the other 1/4-28 IN. NUT to hang loose

on the exposed CABLE until the SPRING PIN ASSEMBLY is attached.

 

 

 

 

· Securely assemble the SPRING PIN ASSEMBLY to the

 

 

 

 

 

SPRING PIN BARREL. (!!! IMPORTANT !!! TIGHTEN

 

 

 

 

 

THE NUT OF THE SPRING PIN ASSEMBLY SE-

 

 

8

 

 

CURELY)

 

 

 

 

 

 

 

 

 

 

 

 

 

· Swing the PRESS ARM (8) up until the SPRING PIN of the

 

75

65

 

 

PUSH/PULL CABLE

engages in one of

the adjustment

 

 

 

 

 

holes.

 

 

 

 

 

 

 

· Thread the second 1/4-28 IN. NUT onto the threaded end of

 

 

 

 

 

the CABLE, and cinch the two 1/4-28 IN. NUTS around the

 

 

 

 

 

flat.

 

 

 

 

 

 

 

· Use the extra thread on the end of the CABLE to adjust out

 

 

 

 

 

slack. ( !!! DO NOT ADJUST OUT TO FAR !!! AL-

 

 

 

 

 

WAYS ALLOW SPRING PIN ASSEMBLY TO FULLY

 

 

 

 

 

ENGAGE)

 

 

 

 

9

 

 

 

 

 

 

 

 

 

STEP 10

 

 

 

76

65

 

 

 

 

 

 

 

 

 

• Securely tighten two 5/32” SET SCREWS (65) and insert

 

 

 

 

 

two 3 X 2” END CAPS (75) into the open ends of PRESS

 

 

 

 

 

ARM (8) as shown in FIGURE 10.

 

 

 

 

 

 

• Securely tighten two 5/32" SET SCREWS (65) and insert

 

 

 

 

48

two 2” SQ. END CAPS (76) into the open ends of PRESS

 

 

 

 

 

 

 

77

6

ARM LEVER (9) as shown in FIGURE 10.

 

 

51

 

 

 

 

 

 

 

 

 

 

 

 

• Securely tighten one 3/8 X 1” BOLT (35), one 3/8” WASHER

3/8 X 1” 35

 

 

 

 

 

 

 

 

 

(51), and one 3/8” LOCKNUT (48) to the bottom of AD-

 

 

 

 

 

JUSTMENT SLIDE (6) as shown in FIGURE 10.

 

 

 

 

 

• Insert one 1-3/4” SQ. END CAP (77) into the end of AD-

FIGURE 10

 

 

 

JUSTMENT SLIDE (6) as shown in FIGURE 10.

 

 

 

1/2

1/2

1/2

1/2

4

1/2

 

1/2

0

1

2

3

5

 

6

 

 

 

9

 

 

 

 

Image 9
Contents Home GYM Bolt Length Ruler KEY Description QTY Parts ListStep 50 1/2 LOW Height X 3-3/4 42 1/2 X X 3-3/4 42 1/2 X LOW Height TAB Detail Ways Allow Spring PIN Assembly to Fully Engage StepLocknuts 38 3/8 X 2-3/4 Silicon or teflon spray available at most hard Ware stores Tighten 37 3/8 X Roller PAD 32 with rubbing alcohol or water. Also X 3 47 1/2 X 5-1/2 42 1/2 X 50 1/2 LOW HT Lowheight LOCKNUT50.NOTE NUT 48. Note Make sure LEG EXTAssemble one 3-1/2 Pulley 79 to the Floating Pulley Cable Guide Step Step Step 36 3/8 X 1-3/4 See Detail Cableadjustment Adjustment Adjustment Lowerfloating PulleybracketUpperfloatingpulleybracket Step