ARM ASSEMBLY
CABLE ASSEMBLY
18.Press a 1 3/4” Square Inner Cap (48) into the lower end of the Left Arm (6). Wet the lower end of the Left Arm with soapy water. Slide a 10” Pad (45) onto the Left Arm.
Repeat this step with the Right Arm (5).
19.Locate and open the parts bags labeled “CABLE ASSEMBLY” and “PULLEYS.”
During steps 19 through 50, refer to the CABLE DIAGRAMS on pages 26 and 27 of this manual to verify proper cable routing. Before beginning this section, fully unwind the five Cables and identify the Cables by com- paring the lengths and the ends. The approxi- mate length of each Cable, in inches, is listed after the key number in the drawing.
IMPORTANT: While assembling the cables, do not overtighten the bolts and nuts attaching the pulleys. The pulleys must be able to turn freely.
20.Insert a 5/16” x 1” Bolt (97) through the brack- et on the Right Arm (5). Tighten a 5/16” Nylon Jam Nut (91) onto the Bolt.
Find the Butterfly Cable
Leave enough room between the two Jam Nuts for the Cable to pivot.
11
18 |
|
| 6 |
5 |
|
| 48 |
22 | 22 |
19 |
|
| |
| |
| |
| |
| |
20 |
|
| 91 |
| 89 |
| 5 |
| 97 |