Whirlpool W10115229B-SP Location Requirements, Parts supplied, Parts needed, You will need

Page 5

Parts supplied:

Leveling legs (4)

Parts package is located in dryer drum. Check that all parts are included.

Parts needed:

Check local codes. Check existing electrical supply and venting. See “Electrical Requirements” and “Venting Requirements” before purchasing parts.

Check code requirements. Some codes limit, or do not permit, installing dryer in garages, closets, mobile homes, or sleeping quarters. Contact your local building inspector.

Optional Equipment: (Not supplied with dryer)

Refer to your “Use and Care Guide” for information about accessories available for your dryer.

Location Requirements

You will need:

A location allowing for proper exhaust installation. See “Venting Requirements.”

A separate 30 amp circuit for electric dryers. A separate 15 or 20 amp circuit for gas dryers.

If you are using power supply cord, a grounded electrical outlet located within 2 ft. (610 mm) of either side of dryer. See “Electrical Requirements.”

A sturdy floor to support dryer and a total weight (dryer and load) of 200 lbs. (90.7 kg). The combined weight of a companion appliance should also be considered.

Level floor with maximum slope of 1" (25 mm) under entire dryer. If slope is greater than 1" (25 mm), install Extended Dryer Feet Kit, Part Number 279810. If not level, clothes may not tumble properly and automatic sensor cycles may not operate correctly.

Do not operate your dryer at temperatures below 45°F (7°C). At lower temperatures, the dryer might not shut off at the end of an automatic cycle. Drying times can be extended.

The dryer must not be installed or stored in an area where it will be exposed to water and/or weather.

Check code requirements. Some codes limit, or do not permit, installation of the dryer in garages, closets, mobile homes, or sleeping quarters. Contact your local building inspector.

NOTE: No other fuel-burning appliance can be installed in the same closet as a dryer.

5

Image 5
Contents Gaz É.-U. et Canada et Électrique Canada uniquement Table of Contents Table des matièresDryer Safety Page Tools and Parts Tools needed for all installationsTools needed for gas installations Parts supplied Location RequirementsParts needed You will needWide Models Dryer Dimensions Installation clearancesInstallation Spacing Installation spacing for recessed area or closetElectrical Requirements Install Leveling LegsPrepare dryer for leveling legs It is your responsibilityScrew in leveling legs Gas Supply RequirementsBurner input requirements Dryer gas pipeVenting Requirements Optional exhaust installations Recommended exhaust installationsAlternate installations for close clearances Plan Vent SystemVent System Chart Install Vent SystemVent System Chart Wide Long Vent Models Only Install exhaust hoodConnect Vent Make Gas ConnectionTighten and adjust leveling legs Complete Installation ChecklistLevel Dryer Reverse Door Swing OptionalRemove bottom screws Place towel on dryerLift door off top screws Remove and transfer hinge hole plugsRemove screws from door Remove screws from hingesRotate outer door Super Wide Side-Swing DoorAttach door hinges Flip door over Remove door strikeWide Model Side-Swing Door Remove door strike plug Remove bottom screwsRemove and transfer plugs Remove screws from door Attach door hingesFlip door over Wide Model Side-Swing Door with Glass Separate inner from outer door Flip door over Rotate outer doorRemove door strike Remove door strike plug TroubleshootingSécurité de la sécheuse Page Outillage et pièces Outils nécessaires pour toutes les installationsOutils nécessaires aux installations au gaz Exigences d’emplacementPièces fournies Pièces nécessairesEspacement pour une installation Espacements d’installationEspacement pour une installation dans un Encastrement ou dans un placard’est à l’utilisateur qu’incombe la responsabilité de Spécifications électriquesSpécifications de l’alimentation en gaz Installation des pieds de nivellementPréparer la sécheuse pour les pieds de nivellement Visser dans les pieds de nivellementExigences concernant le raccordement au gaz Canalisation de gazCanalisation d’arrivée de gaz de la sécheuse Caractéristiques d’alimentation du brûleurÉpreuve sous pression de l’alimentation en gaz Altitudes supérieures à 10 000 pieds 3 048 mExigences concernant l’evacuation Installations d’évacuation facultatives Installations d’évacuation recommandéesInstallations alternées pour dégagements étroits Planification du système d’évacuationDéterminer l’itinéraire d’acheminement du conduit Tableau des systèmes d’évacuationDispositions spéciales pour les maisons mobiles Raccordement au gaz Installation du circuit d’évacuationRégler l’aplomb de la sécheuse Déplacer la sécheuse à son emplacement finalRaccorder le conduit d’évacuation La bouche d’évacuationSi la sécheuse ne démarre pas, vérifier ce qui suit Achever l’installation liste de VérificationInversion du sens de l’ouverture De la porte facultatif Modèle large avec porte à grande ouverture latérale de Ôter les vis inférieuresSoulever la porte pour la dégager des vis supérieures Porte à très grande ouverture latérale de Contrôler l’alignement de la gâche de la portePlacer une serviette sur la sécheuse Ôter les vis du panneau de porte Ôter les vis des charnièresFaire pivoter la porte externe Retourner la porteRetirer la gâche de porte Modèle large avec porte à ouverture latérale de Retirer le bouchon d’obturation de la gâche de porteFixer les charnières de porte Ôter les vis des charnières Retourner la porte’aide des mêmes 4 vis Placer une serviette sur la sécheuse Faire pivoter la porte externe Dépannage W10115228B W10115229B-SP