Schneider Electric E4800 manual Site Planning, Access to Power and Lighting

Page 14

PowerLogicTM EM4800 Series

930-110-01-B.00

Installation

04/2011

 

 

If using a modem, these items are also required:

phone or butt set to test the phone line

RJ11 junction box

RJ11 splitter to tap into the existing junction box

RJ11 patch cable

xDSL filter if required (many businesses have their internet access on the same line as the fax)

Site Planning

1.

Determine the number of PowerLogic EM4800 series meters to be

 

 

installed and ensure adequate space. For clearances, see Figure 4 on

 

 

page 10.

 

2.

Determine the number of analog phone lines or Ethernet drops

 

 

required, and ensure they are installed before installing the PowerLogic

 

 

EM4833, EM4880 and EM4805 meters. The recommended maximum

 

 

number of PowerLogic meters per phone line is 50.

 

3.

Determine the number and types of meters or monitors required

 

 

(single-phase, network, or three-phase).

 

4.

Determine the model number and correct sense voltage based on the

 

 

voltage label on the top right side of the unit.

Access to Power and Lighting

The installation site must be supplied with access to the main electrical panel and any sub-panels. Portable or permanent lighting must be available to provide the installers with a clear view of the equipment and of the installation environment. Each installation may vary depending on physical site restrictions.

Installation Procedures

This section provides information about activities that must be performed to

 

install the PowerLogic EM4833, EM4880 and EM4805 meters in a

 

single-phase 2-wire, single-phase 3-wire (network), or three-phase 4-wire

 

application. The installation procedures must be performed in the following

 

order:

 

 

1.

“Mounting the PowerLogic EM4800 meter” on page 9

 

2.

“Installing Potential Transformers for Three-Phase Service Greater

 

 

Than 277V” on page 11

 

3.

“Installing the Sense Voltage and Control Voltage Cables in Wye and

 

 

Delta Services” on page 13

 

4.

“Installing the Current Transformers” on page 21

 

5.

“Connecting the Communications” on page 30

 

 

a.

“Connecting the Phone Line” on page 30

 

 

b.

“Connecting the Ethernet Cable” on page 30

 

 

c.

“Manually Testing Communications” on page 30

 

6.

“Start-Up Sequence” on page 30

 

7.

“Recording the Meter Map” on page 32

8

© 201 Schneider Electric All Rights Reserved

Image 14
Contents PowerLogicTM Series EM4800 Procedure Digital apparatus complies with Canadian ICES-003Industry Canada Class B Emission Compliance Statement  Schneider Electric All Rights Reserved Table of Contents Page PowerLogic EM4800 series System Specifications IntroductionPowerLogic EM4800 series meter specifications EnvironmentalFront Panel Display EM4800PowerLogic EM4833 and PowerLogic EM4880 internal view PowerLogic EM4805 internal view Electrical Standards Compliance Safety PrecautionsInjury Receiving InstallationPre-Installation Checklist Access to Power and Lighting Site PlanningMounting the PowerLogic EM4800 meter 10.2 cm 04/2011 Installation Shorting block detail 930-110-01-B.00 Electrical personnel Power is offWiring diagrams Inside equipmentFor a single-phase panel with the 120V variant of the meter 201 Schneider Electric All Rights Reserved 930-110-01-B.00 201 Schneider Electric All Rights Reserved 930-110-01-B.00 Delta service metering Phase B CT is optionalInstalling the Current Transformers Source Installing 5A Converters and CTs on the PowerLogic EM4880 Shows a 5A CT connected to the converter PowerLogic EM4880 5A CT connection to converter X1 CT X2 CT Installing the 5A CTs on the PowerLogic EM4805 Connect the two wiring harnesses to the PowerLogic EM4805Repeat steps 5 to 7 for remaining CTs Remove the shorting block jumperPowerLogic EM4805 CT color pair identification Connecting the Ethernet Cable Connecting the CommunicationsConnecting the Phone Line Manually Testing CommunicationsPulse Inputs Normal ModeDiagnostics Mode Display NavigationRemote Display Recording the Meter MapInstallation Record sample shown Maintenance Regulatory Compliance Graphical symbols that appear on equipment Graphical symbolsShows the graphical symbols that appear on the equipment Index PowerLogicTM EM4800 Series 930-110-01-B.00 Index 04/2011 User Notes Page 930-110-01-B.00 04/2011
Related manuals
Manual 30 pages 57.56 Kb