| PowerLogicTM EM4800 Series |
04/2011 | Installation |
|
|
For a 416Y/240V (or 380Y/220V)
•Connect meter terminal A to the voltage disconnect phase A (red wire)
•Connect meter terminal B to the voltage disconnect phase B (black wire)
•Connect meter terminal C to the voltage disconnect phase C (blue wire)
•Connect meter neutral terminal to neutral bar in the voltage disconnect panel (white wire)
•Connect earth wire to earth post using lug provided
•Install power supply shorting jumpers (see Figure 8)
Figure 8: PowerLogic EM4800 meter 416Y/240V three-phase wye service connection
2 | 3 | 4 | 5 |
1
8
7
9 | 6 |
Legend:
1BX cable
2 Earth
3 Phase C (blue)
4 Phase B (black)
5 Shorting jumper
6 Sense voltage terminal block (J3)
7 Neutral (white)
8 Phase A (red)
9