Schneider Electric E4800 manual Installing the 5A CTs on the PowerLogic EM4805

Page 33

930-110-01-B.00

PowerLogicTM EM4800 Series

04/2011

Installation

 

 

Installing the 5A CTs on the PowerLogic EM4805

Use the two 12-pair wiring harnesses provided with the meter to connect the 5A CTs to the PowerLogic EM4805.

For wire color coding, see Table 3 or the label inside the outer cover of the meter. Follow these instructions to install the 5A CTs on the PowerLogic EM4805.

Do not apply power until you have made these connections and followed all instructions below:

• Connect all CTs to shorting blocks to the appropriate circuits

• Connect the shorting blocks to the cables

• Connect the cables to the PowerLogic EM4805

DANGER

HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH

• Turn off all power supplying this equipment before working on or inside the equipment.

• Always use a properly rated voltage sensing device to confirm the power is off.

• NEVER open circuit a CT; use the shorting block to short circuit the leads of the CT before removing the connection from the meter.

• Do not crimp the insulation when making the wire connections.

Failure to follow these instructions will result in death or serious injury.

1. Connect the two wiring harnesses to the PowerLogic EM4805.

The connectors are labeled Plug 1/Plug 5 to Plug 4/Plug 8 on the cable. This is also labeled on the meter. Ensure the connectors are inserted in the proper order and that the connectors are securely locked in place.

a. Connect the first wiring harness to the Mate-n-LokTMconnectors 1 to 4, and secure the cables to the PowerLogic EM4805 chassis with cable ties.

b. Connect the second wiring harness to the Mate-n-LokTMconnectors 5 to 8, and secure the cables to the PowerLogic EM4805 chassis with cable ties.

2. Turn off the power feed to the panel where the CTs are being installed. Always use a properly rated voltage sensing device to confirm the power is off.

3. Route the free end of the cable out of the meter enclosure through the slot in the base of the chassis.

4. Strip the plastic sheaths to an appropriate length to expose the wire pairs. Cut and strip the wire pair leads to an appropriate length.

5. Connect the wire pair leads from the meter to the CT shorting block. See Table 3 for the color pair assignment of each meter point. Ensure that the CT shorting block is in the shorted position.

6. Connect the CT wire pair leads to the input of the CT shorting block. See Table 3 for the color pair assignment of each meter point.

7. Remove the feed wire from the circuit breaker, place the CT over the wire, and reconnect to the circuit breaker. Ensure that the arrow on the CT label is pointing in the direction of the energy flow (toward the load).

NOTE: The direction of the energy flow is indicated on the CT.

© 201 Schneider Electric All Rights Reserved

27

Image 33
Contents PowerLogicTM Series EM4800 Digital apparatus complies with Canadian ICES-003 ProcedureIndustry Canada Class B Emission Compliance Statement  Schneider Electric All Rights Reserved Table of Contents Page Introduction PowerLogic EM4800 series System SpecificationsEnvironmental PowerLogic EM4800 series meter specificationsEM4800 Front Panel DisplayPowerLogic EM4833 and PowerLogic EM4880 internal view PowerLogic EM4805 internal view Safety Precautions InjuryElectrical Standards Compliance Installation Pre-Installation ChecklistReceiving Site Planning Access to Power and LightingMounting the PowerLogic EM4800 meter 10.2 cm 04/2011 Installation Shorting block detail 930-110-01-B.00 Wiring diagrams Power is offElectrical personnel Inside equipmentFor a single-phase panel with the 120V variant of the meter 201 Schneider Electric All Rights Reserved 930-110-01-B.00 201 Schneider Electric All Rights Reserved 930-110-01-B.00 Phase B CT is optional Delta service meteringInstalling the Current Transformers Source Installing 5A Converters and CTs on the PowerLogic EM4880 Shows a 5A CT connected to the converter PowerLogic EM4880 5A CT connection to converter X1 CT X2 CT Connect the two wiring harnesses to the PowerLogic EM4805 Installing the 5A CTs on the PowerLogic EM4805Remove the shorting block jumper Repeat steps 5 to 7 for remaining CTsPowerLogic EM4805 CT color pair identification Connecting the Phone Line Connecting the CommunicationsConnecting the Ethernet Cable Manually Testing CommunicationsDiagnostics Mode Normal ModePulse Inputs Display NavigationRecording the Meter Map Remote DisplayInstallation Record sample shown Maintenance Regulatory Compliance Graphical symbols Shows the graphical symbols that appear on the equipmentGraphical symbols that appear on equipment Index PowerLogicTM EM4800 Series 930-110-01-B.00 Index 04/2011 User Notes Page 930-110-01-B.00 04/2011
Related manuals
Manual 30 pages 57.56 Kb

E4800 specifications

Schneider Electric's E4800 is a robust solution designed for comprehensive energy management, combining advanced features, innovative technologies, and user-friendly characteristics that cater to the needs of various industries. This device primarily focuses on enhancing efficiency in energy consumption and optimizing operational performance.

One of the standout features of the E4800 is its ability to monitor and manage energy consumption in real-time. This capability allows businesses to identify energy usage patterns, track costs, and gain insights into where energy can be saved. The real-time data analysis supports decision-making, enabling organizations to implement energy-saving strategies effectively.

The E4800 is equipped with an intuitive user interface that simplifies navigation and data interpretation. Users can access detailed analytics and reporting tools that provide visibility into energy performance metrics. This user-friendly aspect ensures that both technical and non-technical staff can utilize the system, fostering a culture of energy efficiency across the organization.

Additionally, Schneider Electric has integrated advanced communication technologies into the E4800. It supports various communication protocols such as Modbus, BACnet, and Ethernet, enabling seamless integration with existing systems and infrastructure. This versatility ensures that organizations can leverage their current investments in technology while upgrading to more advanced energy management solutions.

The E4800 is also designed with scalability in mind. Organizations can easily expand their energy management capabilities as their needs grow. Whether managing a single facility or a multi-site operation, the E4800 can adapt to varying requirements without significant overhauls or disruptions.

Another noteworthy characteristic is its compliance with global standards for energy management and sustainability. By utilizing the E4800, companies can demonstrate their commitment to environmental responsibility and adherence to regulations, which is increasingly important in today’s business landscape.

Lastly, Schneider Electric's E4800 comes with robust support services, ensuring that users can access assistance whenever needed. This commitment to customer service solidifies its position as a reliable solution for energy management.

In summary, Schneider Electric's E4800 offers a comprehensive suite of features designed for effective energy management, leveraging real-time analytics, versatile communication technologies, scalability, compliance with global standards, and excellent customer support, making it an ideal choice for businesses aiming to enhance their energy efficiency and sustainability.