REGULATORY COMPLIANCE

The PowerLogic EM4800 meter must be installed by a qualified electrician

 

with knowledge of local installation regulations. Initial installation of the unit,

and any subsequent modification to the unit, must be inspected by the local electrical inspection authority.

The PowerLogic EM4800 meter complies with the standards listed in Table 4.

Table 4: Regulatory Compliance

Discipline

Regulatory and industry standard

Standards

UL certified to IEC/EA/UL/CSA 61010-1 2nd Edition

 

CSA-C22.2 No. 61010-1-04

 

 

Emissions (EMC)

FCC Part 15 Class B, ICES-003 EN55022, IEC 6100-4-5

 

 

Surge power/telephone lines

ANSI/TIA968-A: 2002

 

 

Equipment servicing and access

The information in this section must be considered as a mandatory

 

requirement, and must be strictly adhered to when installing and operating

 

PowerLogic EM4833, EM4880 and EM4805 meters.

 

Access to equipment

 

The equipment must be accessible to authorized personnel only. Equipment

 

must be installed in areas where access can be restricted.

 

Servicing the equipment

 

No preventive maintenance is required on any of the equipment. Visually

 

inspect the equipment yearly and ensure it is free of dust or other particles.

 

If necessary, wipe with a clean cloth.

 

Component servicing

 

Individual components are not user-serviceable, and must be returned to

 

Schneider Electric for repair. If an equipment fault occurs, do not attempt to

 

repair the faulty component.

 

All maintenance activities should be performed by qualified personnel only.

 

Do not perform any operating or maintenance procedures that are not

 

described in the product documentation provided by Schneider Electric.

© 201 Schneider Electric All Rights Reserved

35

Image 41
Contents PowerLogicTM Series EM4800 Digital apparatus complies with Canadian ICES-003 ProcedureIndustry Canada Class B Emission Compliance Statement  Schneider Electric All Rights Reserved Table of Contents Page Introduction PowerLogic EM4800 series System SpecificationsEnvironmental PowerLogic EM4800 series meter specificationsEM4800 Front Panel DisplayPowerLogic EM4833 and PowerLogic EM4880 internal view PowerLogic EM4805 internal view Electrical Standards Compliance Safety PrecautionsInjury Receiving InstallationPre-Installation Checklist Site Planning Access to Power and LightingMounting the PowerLogic EM4800 meter 10.2 cm 04/2011 Installation Shorting block detail 930-110-01-B.00 Wiring diagrams Power is offElectrical personnel Inside equipmentFor a single-phase panel with the 120V variant of the meter 201 Schneider Electric All Rights Reserved 930-110-01-B.00 201 Schneider Electric All Rights Reserved 930-110-01-B.00 Phase B CT is optional Delta service meteringInstalling the Current Transformers Source Installing 5A Converters and CTs on the PowerLogic EM4880 Shows a 5A CT connected to the converter PowerLogic EM4880 5A CT connection to converter X1 CT X2 CT Connect the two wiring harnesses to the PowerLogic EM4805 Installing the 5A CTs on the PowerLogic EM4805Remove the shorting block jumper Repeat steps 5 to 7 for remaining CTsPowerLogic EM4805 CT color pair identification Connecting the Phone Line Connecting the CommunicationsConnecting the Ethernet Cable Manually Testing CommunicationsDiagnostics Mode Normal ModePulse Inputs Display Navigation Recording the Meter Map Remote DisplayInstallation Record sample shown Maintenance Regulatory Compliance Graphical symbols that appear on equipment Graphical symbolsShows the graphical symbols that appear on the equipment Index PowerLogicTM EM4800 Series 930-110-01-B.00 Index 04/2011 User Notes Page 930-110-01-B.00 04/2011