To connect the 5A CT to the converter on the PowerLogic EM4880, follow these steps:

DANGER

HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH

• Turn off all power supplying this equipment before working on or inside the equipment.

• Always use a properly rated voltage sensing device to confirm the power is off.

• NEVER open circuit a CT; use the shorting block to short circuit the leads of the CT before removing the connection from the meter.

• Do not crimp the insulation when making the wire connections.

Failure to follow these instructions will result in death or serious injury.

1. Connect the X1 lead of the 5A CT to the shorting device.

2. Connect the X2 lead of the 5A CT to the shorting device.

3. Connect the X1 lead (red) from the 5A side of the converter to the CT X1 lead on the shorting device.

4. Connect the X2 lead (black) from the 5A side of the converter to the CT X2 lead on the shorting device.

5. Connect the X1 lead (white) from the 80mA side of the converter to the X1 lead within the 25 pair cable for the selected meter point ID listed in Table 2.

6. Connect the X2 lead (black) from the 80mA side of the converter to the X2 lead within the 25 pair cable for the selected meter point ID listed in Table 2

Figure 14 shows a 5A CT connected to the converter.

24

© 201 Schneider Electric All Rights Reserved

Image 30
Contents PowerLogicTM Series EM4800 Procedure Digital apparatus complies with Canadian ICES-003Industry Canada Class B Emission Compliance Statement  Schneider Electric All Rights Reserved Table of Contents Page PowerLogic EM4800 series System Specifications IntroductionPowerLogic EM4800 series meter specifications EnvironmentalFront Panel Display EM4800PowerLogic EM4833 and PowerLogic EM4880 internal view PowerLogic EM4805 internal view Safety Precautions InjuryElectrical Standards Compliance Installation Pre-Installation ChecklistReceiving Access to Power and Lighting Site PlanningMounting the PowerLogic EM4800 meter 10.2 cm 04/2011 Installation Shorting block detail 930-110-01-B.00 Electrical personnel Power is offWiring diagrams Inside equipmentFor a single-phase panel with the 120V variant of the meter 201 Schneider Electric All Rights Reserved 930-110-01-B.00 201 Schneider Electric All Rights Reserved 930-110-01-B.00 Delta service metering Phase B CT is optional Installing the Current Transformers Source Installing 5A Converters and CTs on the PowerLogic EM4880 Shows a 5A CT connected to the converter PowerLogic EM4880 5A CT connection to converter X1 CT X2 CT Installing the 5A CTs on the PowerLogic EM4805 Connect the two wiring harnesses to the PowerLogic EM4805Repeat steps 5 to 7 for remaining CTs Remove the shorting block jumperPowerLogic EM4805 CT color pair identification Connecting the Ethernet Cable Connecting the CommunicationsConnecting the Phone Line Manually Testing CommunicationsPulse Inputs Normal ModeDiagnostics Mode Display NavigationRemote Display Recording the Meter MapInstallation Record sample shown Maintenance Regulatory Compliance Graphical symbols Shows the graphical symbols that appear on the equipmentGraphical symbols that appear on equipment Index PowerLogicTM EM4800 Series 930-110-01-B.00 Index 04/2011 User Notes Page 930-110-01-B.00 04/2011