Schneider Electric E4800 manual Index

Page 43

930-110-01-B.00

PowerLogicTM EM4800 Series

04/2011

Index

 

 

Index

Numerics

347V installation

typical three-phase configuration 12 5A converters and current transformers

install 23

5A current transformers install 27

A

audience 1

C

compliance electrical safety 6

control voltage and current meter 2

current transformers install 22 meter 2

D

delta service

install sense voltage and control voltage cables 13 dimensions

meter 2

E

electrical safety compliance 6 equipment

access 35 servicing 35

equipment servicing 35

F

fuse rating meter 2

I

install

5A converters and current transformers 23

5A current transformers 27 potential transformers 11

installation 7 installation procedures

overview 8

Installing 23

M

maximum altitude meter 2

maximum pulse per second meter 2

measurement accuracy meter 2

meter

control voltage and current 2

CT color pair identification 26, 29 current transformers 2

dimensions 2 fuse rating 2

installation in a 120/208V three-phase wye panel with 120V variant 16

installation in a 240/416V three-phase wye panel with 230/ 240V variant 17

installation in a 277/480V three-phase wye panel with 120V variant 18

installation in a 347/600V or higher three-phase wye panel with 120V variant 19

installation in a single-phase panel with 120V variant 15 installation in a three-phase Delta panel with 120V variant

20

internal view 45maximum altitude 2 maximum pulse per second 2 measurement accuracy 2 minimum pulse width 2 mounting 9

NVM storage 2 onboard Ethernet port 2 onboard modem 2 operating humidity 2 operating temperature 2 pollution degree 2 pulse inputs 1 and 2 2 sense voltage 2

serial port 2 specifications 2 usage environment 2 weight 2

meter map recording 32

minimum pulse width meter 2

mounting meter 9

N

NVM storage meter 2

O

onboard Ethernet port meter 2

onboard modem meter 2

operating humidity meter 2

operating temperature meter 2

P

pollution degree meter 2

potential transformers install 11

© 201 Schneider Electric All Rights Reserved

37

Image 43
Contents PowerLogicTM Series EM4800 Digital apparatus complies with Canadian ICES-003 ProcedureIndustry Canada Class B Emission Compliance Statement  Schneider Electric All Rights Reserved Table of Contents Page Introduction PowerLogic EM4800 series System SpecificationsEnvironmental PowerLogic EM4800 series meter specificationsEM4800 Front Panel DisplayPowerLogic EM4833 and PowerLogic EM4880 internal view PowerLogic EM4805 internal view Injury Safety PrecautionsElectrical Standards Compliance Pre-Installation Checklist InstallationReceiving Site Planning Access to Power and LightingMounting the PowerLogic EM4800 meter 10.2 cm 04/2011 Installation Shorting block detail 930-110-01-B.00 Inside equipment Power is offWiring diagrams Electrical personnelFor a single-phase panel with the 120V variant of the meter 201 Schneider Electric All Rights Reserved 930-110-01-B.00 201 Schneider Electric All Rights Reserved 930-110-01-B.00 Phase B CT is optional Delta service meteringInstalling the Current Transformers Source Installing 5A Converters and CTs on the PowerLogic EM4880 Shows a 5A CT connected to the converter PowerLogic EM4880 5A CT connection to converter X1 CT X2 CT Connect the two wiring harnesses to the PowerLogic EM4805 Installing the 5A CTs on the PowerLogic EM4805Remove the shorting block jumper Repeat steps 5 to 7 for remaining CTsPowerLogic EM4805 CT color pair identification Manually Testing Communications Connecting the CommunicationsConnecting the Phone Line Connecting the Ethernet CableDisplay Navigation Normal ModeDiagnostics Mode Pulse InputsRecording the Meter Map Remote DisplayInstallation Record sample shown Maintenance Regulatory Compliance Shows the graphical symbols that appear on the equipment Graphical symbolsGraphical symbols that appear on equipment Index PowerLogicTM EM4800 Series 930-110-01-B.00 Index 04/2011 User Notes Page 930-110-01-B.00 04/2011
Related manuals
Manual 30 pages 57.56 Kb