Schneider Electric PM5100 manual Front panel meter setup, Meter setup screen navigation

Page 32

Chapter 4—Front panel display and meter setup

PowerLogic™ PM5100 series user guide

 

 

Meter setup screen navigation

The meter’s front panel buttons and display screen allow you to navigate and configure the meter’s setup parameters. The following illustration shows one of the meter setup screens.

Basic setup screen

In this example, the down arrow ( ) indicates there are more parameters below the selected option ( ). Press the down arrow button to display additional parameters. The down arrow disappears when the last item in the list is selected, and there are no more parameters to display.

Front panel meter setup

Meter configuration can be performed directly through the front panel buttons or remotely through software. This section contains instructions on setting up the meter using the front panel.

Related topics

See “Remote Meter Setup” on page 41 for remote meter setup details.

Configuring the basic setup parameters

Proper configuration of the meter’s basic setup parameters is essential for accurate measurement and calculations. Use the Basic Setup screen to define the electrical power system that the meter is monitoring.

NOTICE

UNINTENDED EQUIPMENT OPERATION

After modifying any basic setup parameter:

Verify all standard alarms settings are correct and make adjustments as necessary.

Re-enable all configured alarms.

Failure to follow these instructions can result in incorrect alarm functions.

If standard (1-sec) alarms have been configured and you make subsequent changes to the meter’s basic setup, all alarms are disabled to prevent undesired alarm operation. After saving the changes, confirm all configured standard alarm settings are still valid, reconfigure them as required, and re-enable the alarms.

32

© 2014 Schneider Electric All Rights Reserved

Image 32
Contents PowerLogic PM5100 Series Power and Energy Meter Page Important Information Please notePage Hardware Refer Introduction Chapter Safety Precau TionsEnce Chapter Alarms Chapter MeasurementsCalculations Chapter MID ComplianceGlossary Table of Contents PowerLogic PM5100 series user guide Power and Energy Meter Hardware Parts and AccessoriesBox Contents IntroductionIntroduction Safety Precautions Before You BeginPowerLogic PM5100 series user guide Models, Features and Options Functions and CharacteristicsPM5100 Series Models, Features and Options Functions and CharacteristicsTechnical Specifications Mechanical Characteristics Environmental CharacteristicsSafety precautions SafetyElectromagnetic Compatibility CommunicationDimension Meter mountingMounting the PM5100 Meter wiring Serial No Description SpecificationRecommended cables Make Part code DescriptionWiring Diagrams 3CT 2CTPower system Symbol DescriptionDirect connect voltage limits Current TransformerSymbol Power system setup parameters Power system descriptionMeter setting Voltage and current input wiring Voltage input protectionCurrent input protection Direct connect maximumControl power wiring CommunicationsBalanced system considerations Serial communicationsRS-485 wiring RS-485 network configurationRS-485 cable RS-485 maximum cable lengthDigital outputs Digital output connectionsPowerLogic PM5100 series user guide Hardware Reference Front panel display and meter setup LED indicators Alarm / energy pulsing LED modes Heartbeat / communications LEDRelated topics Notification iconsMeter screen menus Menu tree PM5100 display screen menusFront panel meter setup Meter setup screen navigationConfiguring the basic setup parameters Basic setup screenParameter Values Description Basic setup menu treeBasic setup parameters Communications setup Setting up serial communicationsSerial communications setup menu tree Communications setup parametersHMI settings Setting up the displaySetting up regional settings Display setup menu treeRegional settings setup parameters Setting up the screen passwordsRegional settings menu tree Setting the clock Lost passwordPassword setup menu tree Password setup parametersAdvanced setup Clock setup parametersAdvanced setup menu tree Parameter Format DescriptionSetting up the alarm / energy pulsing LED Advanced setup parametersAlarm / energy pulsing LED settings menu tree LED setup parameterPower or current demand setup parameters Output setup Demand setupDemand setup menu tree Alarms setup Remote Meter SetupFront panel display and meter setup Viewing Meter Data Viewing meter data from the front panelMeter data display screens Displaying data screensPower PQS Volts U-VHarm Energy EAlarm TimerUnbal MnMxClock Using ION Setup to view or modify configuration dataUsing software to view meter data Digital output applications Digital output setupInput / Output Digital output setup menu tree Alarm / energy pulsing LED setupConfiguring digital outputs using the front panel Navigate to I/O configuration Energy Pulsing Input / OutputPowerLogic PM5100 series user guide Second Alarms AlarmsAbout Alarms List of Standard 1-Second Over/Under Alarms AlarmUnary Alarms Alarm PrioritiesAlarm Setup Setting Up 1-Second Alarms Setting Up 1-Second Alarms Viewing Alarm Activity and History Setting Up Unary AlarmsViewing Active Alarms and Alarm Counters Viewing Unacknowledged Alarms and the Alarm History Log PowerLogic PM5100 series user guide Alarms Power factor Measurements and calculationsReal-time readings EnergyPower factor min/max convention Power factor sign conventionIEC mode Power factor minimum and maximumPower demand calculation methods Ieee modeDemand Block interval demandSynchronized demand Block interval demand exampleCurrent demand Predicted demandThermal demand Thermal demand examplePeak demand Predicted demand examplePower quality Harmonic content calculationsHarmonics overview Total Harmonic Distortion and Total Demand DistortionViewing harmonics using the front panel Displaying harmonics dataTHD and thd calculations TDD calculationViewing THD/thd using the front panel Power Quality display screenViewing TDD Example 7th to 15th harmonics for line-to-neutral voltageRelated topics Accuracy test requirements Testing overviewVerifying accuracy Reference device or energy standard Energy pulsingLocation of energy pulsing LED PM5100Verifying accuracy test Calculating the number of required pulses Calculating total powerPercent error calculation Total power limit for alarm / energy LED Total power limit for digital outputEnergy pulsing considerations VT and CT considerationsTypical sources of test errors Test pointsWatt-hour test points example Var-hour test points exampleMeter resets Front panel meter reset screensGlobal resets Reset menu treeSingle resets Single reset optionsAlarm counter options Alarm counter Option DescriptionPowerLogic PM5100 series user guideChapter 11-Meter resets Meter resets Maintenance and Upgrades Password RecoveryPower Meter Memory Identifying the Firmware Version, Model, and Serial NumberControl Power Additional Meter Status InformationDownloading Firmware MeterTroubleshooting Heartbeat/Comms LEDGetting Technical Support Register List TroubleshootingPotential Problem Possible Cause Possible Solution Specifications relevant to MID MID ComplianceMID overview MID compliance for the meterInstallation and wiring MID ComplianceInstalling the terminal covers PM5111 default screenDefault PM5111 display screen Location of terminal coversMID-protected setup parameters Lock-protected setup parametersLock-protected setup parameters Meter firmware versionLocking or unlocking the meter Setting up the PM5111Initializing the meter Setting up lock password Irrecoverable PasswordGlossary TermsPowerLogic PM5100 series user guide Abbreviations PowerLogic PM5100 series user guide Page Schneider Electric 35, rue Joseph Monier CS