Nordyne AND M5S, SERIES M1B GAS Information, Gas Flow Rates Cubic Feet per Hour

Page 33

GAS INFORMATION

GAS FLOW RATES

TIME FOR

CUBIC FEET PER

 

REVOLUTION

ONE REVOLUTION

 

OF GAS METER

(SECONDS)

1

 

5

10

 

 

10

360

 

1,800

3,600

 

 

 

 

 

12

300

 

1,500

3,000

 

 

 

 

 

14

257

 

12,86

2,571

16

225

 

1,125

2,250

18

200

 

1,000

2,000

20

180

 

900

1,800

22

164

 

818

1,636

24

150

 

750

1,500

26

138

 

692

1,385

28

129

 

643

1,286

30

120

 

600

1,200

32

113

 

563

1,125

34

106

 

529

1,059

36

100

 

500

1,000

38

95

 

474

947

40

90

 

450

900

42

86

 

429

857

44

82

 

409

818

46

78

 

391

783

48

75

 

375

750

50

72

 

360

720

52

69

 

346

692

54

67

 

333

667

56

64

 

321

643

58

62

 

310

621

60

60

 

300

600

62

58

 

290

581

64

56

 

281

563

GAS FLOW RATES

TIME FOR

CUBIC FEET PER

 

REVOLUTION

 

ONE REVOLUTION

 

 

OF GAS METER

(SECONDS)

1

 

5

 

10

 

 

 

66

55

 

273

 

545

 

 

 

 

 

 

68

53

 

265

 

529

 

 

 

 

 

 

70

51

 

257

 

514

72

50

 

250

 

500

74

49

 

243

 

486

76

47

 

237

 

474

78

46

 

231

 

462

80

45

 

225

 

450

82

44

 

220

 

439

84

43

 

214

 

429

86

42

 

209

 

419

88

41

 

205

 

409

90

40

 

200

 

400

92

39

 

196

 

391

94

38

 

191

 

383

96

38

 

188

 

375

98

37

 

184

 

367

100

36

 

180

 

360

102

35

 

176

 

353

104

35

 

173

 

346

106

34

 

170

 

340

108

33

 

167

 

333

110

33

 

164

 

327

112

32

 

161

 

321

114

32

 

158

 

316

116

31

 

155

 

310

118

31

 

153

 

305

120

30

 

150

 

300

Table 13. Gas Flow Rates (Cubic Feet per Hour)

CAPACITY OF BLACK IRON GAS PIPE (CU. FT. PER HOUR)

FOR NATURAL GAS (SPECIFIC GRAVITY - 0.60)

NOMINAL BLACK IRON

 

 

LENGTH OF PIPE RUN (FT)

 

 

PIPE DIAMETER (IN.)

10

20

30

40

50

60

70

80

½

130

90

75

65

55

50

45

40

¾

280

190

150

130

115

105

95

90

1

520

350

285

245

215

195

180

170

 

 

 

 

 

 

 

 

 

1 ¼

1,050

730

590

500

440

400

370

350

1 ½

1,600

1,100

890

760

670

610

 

 

Input To Furnace (Btu/hr)

Cubic Feet Per Hour Required =

Heating Value of Gas (Btu/Cu. Ft.)

NOTE: The cubic feet per hour listed in the table above must be greater than the cubic feet per hour of gas fl ow required by the furnace. To determine the cubic feet per hour of gas fl ow required by the furnace, divide the input rate of the furnace by the heating value (from gas supplier) of the gas.

Table 14. Capacity of Black Iron Gas Pipe (cu. ft. per hour)

for Natural Gas w/ Specific Gravity = 0.60

33

Image 33
Contents For installation Installation InstructionsHomeowner Information Installer Information Information Return Air Connections Supply Air ConnectionsStanding Pilot Models Direct Ignition Models Oil Gun Models Requirements and Codes Safety InformationGeneral Installation Gas Piping and Gas Pipe Pressure TestingSafety Combustion and Ventilation AirGeneral Information Minimum ClearancesALL Models Closet Alcove Applications AssemblyUnit Location BlowerReturn Air Connections Circulating AIR RequirementsGas piping is not run in or through the return duct system Supply Air ConnectionsDetermine which duct connector to use from Furnace InstallationGeneral Information Requirements and CodesDuct Connector Sizes Standard Duct Connector Installation Cut-Out Dimensions for Standard Duct ConnectorsInstalling The Furnace Duct Connector TabsRequired ceiling and roof cut-out openings see Roof Jack InstallationRoof Jack Selection Application NotesSlant Deck Flashings Roof Jack Series If Roof Pitch is Slant Deck FactorInstallation of Transit-Mode Venting System Installing The Roof JackConnect fl ue pipe to fl ue collar of furnace. See Figure Secure fl ashing with appropriate fastenersElectrical Information Line Voltage WiringWire Heating Heating/Cooling Low Voltage WiringThermostat Wire Gauge Thermostat Length Unit to T’STATImportant Notes Fuel Supply and PipingFuel line Hook-Up Oil Tank and Piping InstallationLeak Check Fuel Oil TypeConversion to Propane LP Gas Honeywell Gas Valve High Altitude ConversionStanding Pilot Valve Lighting Instructions Standing Pilot ModelsOperating Instructions for Direct Ignition Models M1M Replace the furnace doorBurner Adjustments For oil, shut off all valves Replace the furnace doorPilot Flame Standing Pilot Only Factory Combustion Air Settings Electrode Setting Oil Gun OnlyCombustion Air Standing Pilot Operating SequenceStanding Pilot w/Induced Draft Blowers M1M Models with Direct IgnitionFurnace Controls & Functions Troubleshooting Standing Pilot ModelsDirect Ignition Furnaces Including Gas Gun M1B Series see , Page Optional Accessories Burner will not start and the LED indicator isCad Cell Resistance when Sensing flame Cad cell is operational, replace the primary controlRed LED Indicator Status Control Module Status Indicators M1M SeriesControl Module Status Indicator M1B Control Module Status Indicator M5S SeriesInstaller Information MaintenanceAdditional Oil Furnace Maintenance Clean or replace the oil fi lter element at the oil tankM1GB Burner Direct Blower TonsM1MC Manifold Pressure Natural Gas 3.5 w.cOrifi ce Size Nat. Gas Orifi ce Size LP Equivalent Orifice Sizes for High Altitude InstallationsOutput Mbtuh Orifi ce Size Nat. GasGas Flow Rates Cubic Feet per Hour GAS InformationModels Wiring DiagramsM1GH 077, 090 Models M1GB 056, 070 Models Gas AtmosphericWiring Diagram Steady OFF No power Blinking Wiring Diagram Installation Address Installation / Performance Check List