Emerson SPS 4001B instruction manual Safety Instructionsimportant

Page 40

SPS 4001B

Instruction Manual

IM-106-340AC-1, Rev. 1.0 April 2005

SAFETY INSTRUCTIONSIMPORTANT

SAFETY INSTRUCTIONS FOR THE WIRING

AND INSTALLATION OF THIS APPARATUS

The following safety instructions apply specifically to all EU member states. They should be strictly adhered to in order to assure compliance with the Low Voltage Directive. Non-EU states should also comply with the following unless superseded by local or National Standards.

1. Adequate earth connections should be made to all earthing points, internal and external, where provided.

2. After installation or troubleshooting, all safety covers and safety grounds must be replaced. The integrity of all earth terminals must be maintained at all times.

3. Mains supply cords should comply with the requirements of IEC227 or IEC245.

4. All wiring shall be suitable for use in an ambient temperature of greater than 75°C.

5. All cable glands used should be of such internal dimensions as to provide adequate cable anchorage.

6. To ensure safe operation of this equipment, connection to the mains supply should only be made through a circuit breaker which will disconnect all circuits carrying conductors during a fault situation. The circuit breaker may also include a mechanically operated isolating switch. If not, then another means of disconnecting the equipment from the supply must be provided and clearly marked as such. Circuit breakers or switches must comply with a recognized standard such as IEC947. All wiring must conform with any local standards.

7. Where equipment or covers are marked with the symbol to the right, hazardous voltages are likely to be present beneath. These covers should only be removed when power is removed from the equipment - and then only by trained service personnel.

8. Where equipment or covers are marked with the symbol to the right, there is a danger from hot surfaces beneath. These covers should only be removed by trained service personnel when power is removed from the equipment. Certain surfaces may remain hot to the touch.

9. Where equipment or covers are marked with the symbol to the right, refer to the Operator Manual for instructions.

10. All graphical symbols used in this product are from one or more of the following standards: EN61010-1, IEC417, and ISO3864.

A-2

Image 40
Contents SPS 4001B Single Probe Autocalibration Sequencer Page Table of Contents TOC-2 SPS 4001B Single Probe Autocalibration Sequencer Essential InstructionsPreface SymbolsDefinitions Component Checklist Description and SpecificationsOverview Specifications SpecificationsPhysical Description ManifoldPressure Switch Calibration Gas SolenoidsCircuit Board Calibration Gas Flow MeterTheory of Operation SPS 4001B Calibration Setup Section Installation Overview Mechanical InstallationReference Air Figure GAS ConnectionsCalibration Gas Figure Analytical Electrical ConnectionsGND SPS 4001B Overview Calibration Requirements Section OperationCalibration Gas Tanks Liquid Carbonic GAS Corp Specialty GAS Laboratories Check ValveCAL Recommended Timed IntervalSEMI-AUTOMATIC Calibration Maintenance and Service Fuse ReplacementSPS 4001B, Exploded View Installation REMOVE/INSTALL ChassisRemoval Terminal Connections Circuit Board Replacement Solenoid ReplacementPressure Switch Replacement Troubleshooting SPS 4001B TroubleshootingRelay Failure SPS 4001B Fault Finding SPS 4001B Troubleshooting Flowchart Sheet 1 SPS 4001B Troubleshooting Flowchart Sheet 2 SPS 4001B Replacement Parts SPS 4001B Calibration Components Index No Part Number DescriptionSPS 4001B Appendix a Safety Data Safety Instructionsimportant Belangrijk Vigtigt SPS 4001B Tärkeää SPS 4001B Wichtig Importante Viktig SPS 4001B SPS 4001B Viktigt SPS 4001B Appendix B Return of Materials Returning MaterialSPS 4001B Index Index-2 Warranty IM-106-340AC-1, Rev .0 April SPS 4001B Serial no Order no