Emerson SPS 4001B instruction manual Relay Failure

Page 30

SPS 4001B

Instruction Manual

IM-106-340AC-1, Rev. 1.0 April 2005

1.Verify your calibration setup per "Gas Connections" in Section 2, Installation; Section 3, Operation; and "Flow Meter Adjustments" in Section 4, Maintenance and Service.

2.Perform another calibration and monitor the process. If the calibration fails before both calibration gases finish sequencing, a gas flow problem exists. Refer to Table 5-1or Figure 5-1to troubleshoot the SPS 4001B.

If the calibration setup is correct and the Oxymitter 4000 indicates an invalid slope fault (fault 12) before the gases are purged and a last calibration failed fault (fault 14) after the gases are purged, replace the Oxymitter 4000 cell per the Oxymitter 4000 Oxygen Transmitter Instruction Manual.

Relay Failure

If a semi-automatic or manual calibration is being performed but no 5 - 30 VDC relay output contact (IN CAL or CAL FAIL) is being received by the control room, the circuit board relays are malfunctioning. Replace the circuit board per "Circuit Board Replacement" in Section 4, Maintenance and Service.

NOTE

If the unit is performing frequent auto-calibrations, investigate at the Oxymitter 4000 site or using HART/AMS. This condition may indicate an aging cell in the Oxymitter 4000.

5-2

Image 30
Contents SPS 4001B Single Probe Autocalibration Sequencer Page Table of Contents TOC-2 SPS 4001B Single Probe Autocalibration Sequencer Essential InstructionsSymbols PrefaceDefinitions Description and Specifications Component ChecklistOverview Specifications SpecificationsPhysical Description ManifoldCircuit Board Pressure SwitchCalibration Gas Solenoids Calibration Gas Flow MeterTheory of Operation SPS 4001B Calibration Setup Section Installation Overview Mechanical InstallationGAS Connections Reference Air FigureCalibration Gas Figure Analytical Electrical ConnectionsGND SPS 4001B Section Operation Overview Calibration RequirementsCalibration Gas Tanks Liquid Carbonic GAS Corp Specialty GAS Laboratories Check ValveCAL Recommended Timed IntervalSEMI-AUTOMATIC Calibration Maintenance and Service Fuse ReplacementSPS 4001B, Exploded View REMOVE/INSTALL Chassis InstallationRemoval Terminal Connections Circuit Board Replacement Solenoid ReplacementPressure Switch Replacement Troubleshooting SPS 4001B TroubleshootingRelay Failure SPS 4001B Fault Finding SPS 4001B Troubleshooting Flowchart Sheet 1 SPS 4001B Troubleshooting Flowchart Sheet 2 SPS 4001B Replacement Parts SPS 4001B Calibration Components Index No Part Number DescriptionSPS 4001B Appendix a Safety Data Safety Instructionsimportant Belangrijk Vigtigt SPS 4001B Tärkeää SPS 4001B Wichtig Importante Viktig SPS 4001B SPS 4001B Viktigt SPS 4001B Appendix B Return of Materials Returning MaterialSPS 4001B Index Index-2 Warranty IM-106-340AC-1, Rev .0 April SPS 4001B Serial no Order no