LG Electronics LGENBOX-01, LGxxxA1C-B3 installation instructions Table of Contents, Revisions

Page 2

Table of Contents

1 Safety

3

1-1 Safety Symbols

3

1-2 Important Safety Instructions

3

1-3 FCC Guidelines

4

1-3 Circuit Symbols

4

2 Introduction

5

3 AC Module

6

3-1 Before Installation

6

3-2 Inspecting the Area of Installation

6

3-3 Inspecting Components of the AC Module

7

3-4 Measuring AC Voltage of the Utility

7

3-5 Wiring Diagram of AC Module System

8

3-6 Installing the AC Junction Box and PV Rack

9

3-7 Mounting the AC Module

9

3-8 Connecting AC Modules (Trunk Cable)

12

3-9 Grounding

16

3-10 Connecting AC Module Array to Distribution Panel

18

(General AC Cable, Transition Cable) –240VAC, 208VAC

3-11 Operation

22

3-12 Maintenance

22

4 EnerBoxTM Communication Gateway

23

4-1 Checking Components of the Communication Gateway

23

4-2 Connecting the Communication Gateway

24

4-3 Configuring the Installation App

25

4-4 Website

28

5 Accessories

29

6 Product Specifications

30

6-1 AC Module

30

6-2 EnerBox

32

6-3 Response to Abnormal Conditions

33

6-4 Dedicated Cables

34

7 Warranty

35

8 Transportation and Storage

35

9 Contact

35

Revisions

Date

Version

Description of Change

Remark

 

 

 

 

6/30/2014

1.0 (1st Edition)

 

 

2

Image 2
Contents AC Module System Installation Instructions Table of Contents RevisionsImportant Safety Instructions SafetySafety Symbols For Micro inverter & Communication Gateway Circuit SymbolsFCC Guidelines For Communication Gateway Indoor use onlyAC Module System IntroductionAdvantages of AC Module System Communication gatewayAC Module Before InstallationInspecting the Area of Installation Inspecting Components of the AC Module Measuring AC Voltage of the UtilityWiring Diagram of AC Module System Mounting the AC module Installing the AC Junction Box and PV RackProduct Specification Fix AC module to the PV rack in the following order Mounting According to the Type of PV rack Trunk connector removal Connecting AC Modules Trunk CableTrunk connector insertion Trunk cable usage and maintenancePage Checking the Accessories Checking AccessoryCable Usages According to AC Junction Box Locations Grounding Samples for Grounding Male transition cable AC output single phase 240VAC Connect the general AC cables in the following orderAC output three phase 208VAC merge type AC output three phase 208VAC split type Maintenance OperationEnerBoxTM Communication Gateway Checking Components of the Communication GatewayConnecting to the Communication Gateway LED status TroubleshootingConfiguring the Installation App Checking installed AC modules LGElectronics Checking conditions of installed AC modules Setting the grid configurationSetting System Configuration WebsiteAccessories Diagram DetailsParameter Section Value Product SpecificationsAC Module Section 240VAC 208VACDimensions EnerBox Internal Communication with AC moduleRange Clearing Time s Response to Abnormal ConditionsDedicated Cables Contact WarrantyTransporting and Storage Disclaimer of Liability
Related manuals
Manual 24 pages 22.32 Kb