LG Electronics LGxxxA1C-B3 Warranty, Transporting and Storage, Contact, Disclaimer of Liability

Page 35

7 Warranty

Disclaimer of Liability

By starting the installation process the installer is acknowledging that he/she has read and completely understands this Installation Manual. He/She further acknowledges that if he/she had any questions regarding this installation manual he/she would have contacted LG with any questions or concerns prior to installation.

By installing an LG Solar module, the installer is fully agreeing not to sue LG, its affiliated companies, successors, or assigns, its administrators, directors, agents, officers, volunteer and employees, other participants in any activity connected to installation, operation, or service of LG Solar Modules, and if applicable, will discharge above listed parties from all liabilities, claims, demands, losses, or damages on his/her account caused or alleged to be caused in whole or in part by the negligence of the LG its affiliated companies, successors, or assigns, its administrators, directors, agents, officers, volunteer and employees.

Disposal

Please contact us, if you have any inqueries related to the disposal or recycling of solar modules from LG

Electronics.

8 Transporting and Storage

Do not loosen the banding, when module is transported by truck, ship and etc. Loose banding may cause damage, like breakage of glass.

Maximum stacking is two pallets. Excessive stacking can stress the AC modules and cause product damage.

Keep the module in its original packing prior to installation.

9 Contact

LG Electronics U.S.A Inc.

1000 Sylvan Avenue, Englewood Cliffs, NJ 07632, U.S.A

1-888-865-3026 lg.solar@lge.com http://www.lg-solar.com

35

Image 35
Contents AC Module System Installation Instructions Revisions Table of ContentsImportant Safety Instructions SafetySafety Symbols For Communication Gateway Indoor use only Circuit SymbolsFCC Guidelines For Micro inverter & Communication GatewayCommunication gateway IntroductionAdvantages of AC Module System AC Module SystemAC Module Before InstallationInspecting the Area of Installation Measuring AC Voltage of the Utility Inspecting Components of the AC ModuleWiring Diagram of AC Module System Mounting the AC module Installing the AC Junction Box and PV RackProduct Specification Fix AC module to the PV rack in the following order Mounting According to the Type of PV rack Trunk cable usage and maintenance Connecting AC Modules Trunk CableTrunk connector insertion Trunk connector removalPage Checking Accessory Checking the AccessoriesCable Usages According to AC Junction Box Locations Grounding Samples for Grounding Male transition cable Connect the general AC cables in the following order AC output single phase 240VACAC output three phase 208VAC merge type AC output three phase 208VAC split type Operation MaintenanceChecking Components of the Communication Gateway EnerBoxTM Communication GatewayLED status Troubleshooting Connecting to the Communication GatewayConfiguring the Installation App Checking installed AC modules LGElectronics Setting the grid configuration Checking conditions of installed AC modulesWebsite Setting System ConfigurationDiagram Details AccessoriesSection 240VAC 208VAC Product SpecificationsAC Module Parameter Section ValueDimensions Internal Communication with AC module EnerBoxRange Clearing Time s Response to Abnormal ConditionsDedicated Cables Disclaimer of Liability WarrantyTransporting and Storage Contact
Related manuals
Manual 24 pages 22.32 Kb